Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

158results about How to "Reduce erection" patented technology

Solar driving device of coil type automatic walking sprinkler

The invention relates to a solar driving device of a coil type automatic walking sprinkler. The device comprises a coil type sprinkler, wherein the coil type sprinkler is provided with a solar panel, a light illumination sensor, a rotary mechanism, a driving motor, a speed reducer, a speed sensor and the like. The device has the advantages that the device is driven by a motor which can be powered by solar energy, so the defect of high energy consumption of common water turbine driving of the general sprinkler is overcome; a storage battery is powered by the solar panel, so the complicated condition of a power supply line overhead a farmland is avoided; the solar panel is provided with an intelligent sun tracing system, the solar panel is enabled to automatically rotate and adjust the angles, and the higher photovoltaic power generation efficiency of the solar panel is realized; a hose pipe is provided with the speed sensor, a closed loop control system is controlled through speed to enable the hose pipe of a coiling vehicle to move at constant speed during pipe coiling, the speed difference caused by the winding layering of the hose pipe is avoided, and the uniform distribution of water spraying amount is ensured; the defects of high energy consumption, heavy weight, nonuniform distribution of water spraying amount and the like of the existing coil type sprinkler are overcome, and the solar driving device is a novel green, energy-saving and environment-friendly type intelligent driving device.
Owner:NORTHWEST A & F UNIV

Construction method for bridge with few brackets and bridge

The invention relates to a construction method for a bridge with few brackets. The construction method comprises a dual-hoop construction step. The dual-hoop construction step comprises the following steps of mounting dual hoops on the same pier column, wherein the dual hoops comprise a first hoop and a second hoop of which the structures are the same, the first hoop is provided with a first supporting piece, the second hoop is provided with a second supporting piece, and the first supporting piece and the second supporting piece are staggered in the radial direction of each of the pier columns; and mounting first cushion blocks on the dual hoops, wherein the top surfaces of the first cushion blocks and the top surfaces of the second supporting pieces are on the same level surface. The invention also relates to a bridge. The bridge comprises bridge piers and a cast-in-situ box beam constructed by the dual hoops which are erected by the method disclosed by the invention. An upper part structure is directly mounted to the first cushion blocks and the second supporting piece, so that the erection of the bracket is reduced, and the construction is convenient and fast; no-damage construction is performed on the pier columns, so that the construction efficiency is improved; and each of the hoops on the high pier columns adopts a corresponding dual-semicircle shaping steel die, so that the situation that the contact surface of the hoops and the contact surface of the pier columns are matched is guaranteed, and the hoops can be recycled.
Owner:江苏燕宁工程科技集团有限公司

Installation method of special-shaped and curved-surface suspension type steel structure system

The invention belongs to the technical field of steel structure construction, and particularly relates to an installation method of a special-shaped and curved-surface suspension type steel structuresystem. The problems are solved that the construction precision of a traditional installation method is difficult to guarantee, the construction period is long, a large amount of cost needs to be invested in scaffold and inclined suspender layer-by-layer hoisting, and many high-altitude hidden dangers exist. The special-shaped and curved-surface suspension type steel structure system comprises a core cylinder, a giant truss, a temporary support, an inclined suspender and beams of all floors. The installation method comprises the following steps that S1, the core cylinder is constructed; S2, the temporary support is installed; S3, the giant truss is assembled on the ground; S4, the giant truss is hoisted; S5, the inclined suspender is installed; S6, the temporary support is unloaded; S7, the beams of all the floors are hoisted; and S8, the displacement of the giant truss is monitored in the steps of S4-S7. According to the installation method, the construction precision is guaranteed, the installation efficiency is high, the installation construction period is shortened, and the operation safety risk is reduced. The erection and hoisting cost of a scaffold is saved, the high-altitude butting joints are reduced, the near-edge protection cost is reduced, and therefore the construction cost is reduced.
Owner:CHINA SHANXI SIJIAN GRP

Radar digital platform leveling device and leveling method

The invention relates to a radar digital platform leveling device and method. The leveling method comprises the following steps of sensing the attitude of a vehicle body and a coordinate conversion digital platform by utilizing an attitude angle sensing system to establish a digital platform; calculating the value of an antenna azimuth code salver, the value of an antenna pitch code salver and a transverse rolling angle formed between an antenna array surface X axis and a horizontal plane which are parallel to each other during the working process of a radar; and driving an antenna to the appointed position, the pitch position and the antenna X axis attitude position to realize the radar leveling function. The leveling device comprises an attitude angle sensing system, an antenna drive control system and an antenna leveling mechanism. The attitude angle sensing system is used for sensing a transverse inclination angle and a longitudinal inclination angle of the prior vehicle body as well as an included angle formed between a reference axis of the longitudinal inclination attitude angle and the north direction; the antenna drive control system is used for converting the antenna to the appointed direction through the azimuth code salver and an azimuth driving mechanism; a supporting back frame of the antenna is pushed to rotate by a pitch driving mechanism and the pitch code salver, so that the antenna reaches an appointed pitch angle; the antenna leveling mechanism is used for pushing the antenna to carry out one-dimensional rotation around a ball bearing, so that an X axisin an antenna array surface rectangular coordinate system is parallel to the horizontal plane, thereby the leveling of the radar is finished.
Owner:中国兵器工业第二〇六研究所

Formwork reinforcing device without top support for post-cast strip and construction method thereof

The invention discloses a formwork reinforcing device without top support for a post-cast strip and a construction method thereof. The formwork reinforcing device comprises basement top plates, waterstop screw rods, main rib steel pipes, timber cushion blocks, clamps, back rib timbers, formworks, a post-cast strip beam and plain concrete columns, wherein the basement top plates are respectively arranged at both ends of the post-cast strip beam; the main rib steel pipes are arranged at the upper end and lower end of each basement top plate at equal intervals along the horizontal direction; three water stop screw rods penetrate through each of the main rib steel pipes at equal intervals along the longitudinal direction; the timber cushion blocks are respectively arranged at one end of the upper end surface of each basement top plate. The formwork reinforcing device has the beneficial effects that the problem of accumulation of revolving materials such as lower steel pipes, formworks, timbers and the like at the overhanging end of the post-cast strip in the building construction project are solved, the construction cost is reduced, the load bearing function of the formwork supportingsystem can be replaced, and the project quality of the beam plate at the overhanging area of the post-cast strip is effectively guaranteed; the operation is simple, the use is convenient, the good social benefit is realized, and the formwork reinforcing device is suitable for being popularized and applied.
Owner:CHINA CONSTR 4TH ENG BUREAU 6TH

Main structure construction method by sequentially processing beam slab frameworks, short-leg shear wall and column frameworks

InactiveCN103266766AConstruction duration shortenedShorten the time intervalBuilding material handlingFloor slabConcrete beams
The invention relates to a main structure construction method by sequentially processing beam slab frameworks, short-leg shear wall and column frameworks. The method includes the following steps: a, strapping short-leg shear wall and column rebars; b, mounting the beam slab frameworks; c, calibrating the shear wall and column rebars before strapping beam rebars, immediately performing inspection after strapping the beam rebars, and then strapping floor slab rebars; d, mounting the short-leg shear wall and column frameworks when strapping the floor slab rebars; and e, simultaneously pouring concrete to beam slabs, floor slabs and short-leg shear walls and columns. In the method, mounting of the short-leg shear wall and column frameworks and strapping of the beam slab rebars and the floor slab rebars which are completely not in the same working face can be performed simultaneously, and the mounting of the short-leg shear wall and column frameworks becomes a non-critical work from a critical work and does not occupy construction periods, so that main engineering construction duration of the whole frame shear structure is reduced, and a main structure construction period and time intervals in shutdown and waiting of labor force are greatly shortened.
Owner:JIANGNAN CONSTR CO LTD DONGYANG ZHEJIANG

Overhead pipeline paint spraying walking device and overhead pipeline paint spraying method

The invention discloses an overhead pipeline paint spraying walking device and an overhead pipeline paint spraying method. The overhead pipeline paint spraying walking device comprises an annular support, walking assemblies, limiting assemblies and spraying assemblies. The annular support is provided with an opening used for passing of a pipe bracket of an overhead pipeline. The walking assembliesare arranged on the inner side of the annular support and used for walking on the outer wall of the pipeline. The limiting assemblies are arranged on the inner side of the annular support and used for conducting limiting so that the annular support can move in the axial direction relative to the pipeline but cannot slide along the circumference of the pipeline. The spraying assemblies are connected with the annular support and used for conducting spraying on the pipeline. By means of the overhead pipeline paint spraying walking device and the overhead pipeline paint spraying method, aloft work of operators is effectively reduced, building of temporary facilities is reduced, safety is improved, manufacture and installation are convenient and rapid, and the spraying efficiency is high; thebottom faces of magnets are each in an arc shape matched with the outer wall of the pipeline, the attraction area is enlarged, and the pipeline attraction force is improved; and the annular support isformed by multiple connected arc-shaped plates together so that the overhead pipeline paint spraying walking device and the overhead pipeline paint spraying method can adapt to different diameters ofpipelines, and the application range is widened.
Owner:MCC TIANGONG GROUP

Bridge production system

The invention discloses a bridge production system. The bridge production system comprises a bridge body steel bar binding area, a bridge body pouring area and a gantry crane arranged on the bridge body steel bar binding area and the bridge body pouring area in a striding manner, and the gantry crane is provided with a lifting and moving device. Compared with the prior art, various bridge body prefabricated web steel bar binding table bases are provided in the scheme, bridge body steel bar framework binding is normalized and standardized, consumption of labor force is greatly reduced, the construction period is shortened, and integrity is high. The various bridge body prefabricated web steel bar binding table bases are formed by splicing steel structural pieces and can be cyclically used, the usage number of the binding table bases is reduced, the construction using land is reduced, and convenience is provided for field management. Rubber drawing and pulling bar penetrating construction can be rapidly finished through a rubber bar drawing and pulling device, a prestress hole channel is embedded, the labor intensity is low, and the work efficiency is high. In a side beam pouring tool, a first supporting plate of an effective supporting part can be independent, the size is small, the mass is low, operation is more flexible and is gradually changed during demolding, and therefore damage to concrete can be reduced.
Owner:CHINA RAILWAY 16TH BUREAU GRP RAIL TRANSPORT ENG CO LTD

Anti-toppling tool for installation of ship rudder blades

The invention relates to an anti-toppling tool for installation of ship rudder blades. The anti-toppling tool comprises a combined module vehicle and a rudder blade anti-toppling tool platform; the rudder blade anti-toppling tool platform is fixedly connected to the upper surface of the combined module vehicle through a platform connecting plate; rudder blade anti-toppling tool main body supportsare arranged on the rudder blade anti-toppling tool platform; a rudder blade mounting station is reserved at the position, between the rudder blade anti-toppling tool main body supports, of the rudderblade anti-toppling tool platform; reinforcing diagonal bracings fixedly connected to the combined module vehicle are symmetrically arranged on the outer sides of the rudder blade anti-toppling toolmain body supports; and anti-toppling bracings used for locking the rudder blades are symmetrically arranged on the inner sides of the rudder blade anti-toppling tool main body supports. The anti-toppling tool has the advantages that manual input is saved in the installation process of the rudder blades, the intrinsic safety degree of the installation is improved, in addition, a hydraulic unit transportation platform can be replaced, the vacancy rate of equipment is decreased, the function of the equipment of a company is exerted to the maximum degree, and the objectives of lowering the cost and improving the efficiency are achieved.
Owner:JIANGSU NEW TIMES SHIPBUILDING

Large stadium pipe truss and spiral duct modularization installation method and combination structure

The invention discloses a large stadium pipe truss and spiral duct modularization installation method and a combination structure. The installation method includes the steps of module division of pipe trusses and spiral ducts; factory manufacturing of pipe truss module units and spiral duct module units; assembling of pipe truss modules and spiral duct modules on a construction site. The combination structure is formed by arranging the spiral duct module units into the pipe truss module units through a plurality of fixing units in a penetrating mode. According to the large stadium pipe truss and spiral duct modularization installation method and the combination structure, truss structures and the spiral ducts are modularly assembled on the ground according to design models, the trusses and the ducts are hoisted at the same time, so a mechanical and electrical installation construction procedure and a steel structure construction procedure are combined into one, working time is greatly shortened, work high above the ground and setting up of auxiliary facilities are greatly reduced, the technical level and the efficiency are improved, meanwhile installation time is shortened, and safety of constructors is guaranteed.
Owner:CHINA CONSTR IND & ENERGY ENG GRP CO LTD

Supporting system for construction of super-long water pier prestressed cap beam

The invention discloses a supporting system for construction of a super-long water pier prestressed cap beam. The supporting system comprises a support. The support comprises steel braces and steel tube stand columns, wherein every two steel braces are arranged between the two corresponding adjacent water piers and are arranged in a splayed shape, and every four steel tube stand columns are arranged on the periphery of the corresponding water pier. The bottom end of each brace rod is connected with a pin hinge and a support of the pin hinge. The support of the pin hinge at the bottom end of each steel brace is connected with a bearing platform of the corresponding water pier through an embedded steel plate II. The top end of each brace rod and the top end of each steel tube stand column are each provided with a horizontal supporting cover plate. The horizontal supporting cover plates are fixedly provided with longitudinal supporting beams. The two ends of each longitudinal beam are each provided with a stand box. The stand boxes support transverse bearing beams. Multiple longitudinal distributive beams are fixed to the transverse bearing beams. The longitudinal distributive beams form a systematic horizontal supporting face. The supporting system for construction of the super-long water pier prestressed cap beam is high in bearing capacity, high in stability and suitable for construction of the super-long water pier prestressed cap beam with the length being over 40 m, the installation height being over 8 m and the clear intervals between pier bodies being larger than 18 m.
Owner:中建六局第一建设有限公司 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products