Main structure construction method by sequentially processing beam slab frameworks, short-leg shear wall and column frameworks

A main structure and shear wall technology, applied in building construction, building material processing, construction, etc., can solve the problems of difficult control of concrete quality and prolonged construction period, saving construction period and human resources, shortening construction period, shortening effect of time interval

Inactive Publication Date: 2013-08-28
JIANGNAN CONSTR CO LTD DONGYANG ZHEJIANG
View PDF3 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the continuous development of urban construction, there are more and more small high-rise buildings and high-rise buildings. The short-leg shear wall column-frame shear system is widely used in the design. According to the traditional construction method, the shear wall and column are poured first. The post-cast beam floor concrete construction method is difficult to control the quality of the concrete at the wall, column-beam joints, and the construction period is prolonged

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main structure construction method by sequentially processing beam slab frameworks, short-leg shear wall and column frameworks

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0029] The construction method of the short limb shear wall and column formwork construction technology in the main structure after the beam slab, taking the construction technology of the main structure of the 2# building in a certain garden in Wuxue, Hubei as an example, for the short limb shear wall of the present invention, the column frame The various organizational links of the construction of the main structure of the shear system are comprehensively described. Construction process flow chart see figure 1 .

[0030] 1. Construction preparation Rebar processing

[0031] 1) Do a good job of site layout and site hardening.

[0032] 2) Pile up short-limb shear walls, columns, beams, and slab steel bars prepared on site according to specifications.

[0033] 2. Construction preparation formwork processing

[0034] 1) Selection of formwork materials for short-leg shear walls, columns and beams, and floor slabs:

[0035] a. In the short-limb shear wall and column-frame she...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a main structure construction method by sequentially processing beam slab frameworks, short-leg shear wall and column frameworks. The method includes the following steps: a, strapping short-leg shear wall and column rebars; b, mounting the beam slab frameworks; c, calibrating the shear wall and column rebars before strapping beam rebars, immediately performing inspection after strapping the beam rebars, and then strapping floor slab rebars; d, mounting the short-leg shear wall and column frameworks when strapping the floor slab rebars; and e, simultaneously pouring concrete to beam slabs, floor slabs and short-leg shear walls and columns. In the method, mounting of the short-leg shear wall and column frameworks and strapping of the beam slab rebars and the floor slab rebars which are completely not in the same working face can be performed simultaneously, and the mounting of the short-leg shear wall and column frameworks becomes a non-critical work from a critical work and does not occupy construction periods, so that main engineering construction duration of the whole frame shear structure is reduced, and a main structure construction period and time intervals in shutdown and waiting of labor force are greatly shortened.

Description

technical field [0001] The invention belongs to the field of building construction, and in particular relates to a construction method of a beam slab first and then a short limb shear wall and a column formwork for a main structure. Background technique [0002] With the continuous development of urban construction, there are more and more small high-rise buildings and high-rise buildings. The short-leg shear wall column frame shear system is widely used in the design. According to the traditional construction method, the shear wall and column are poured first. The post-cast beam floor concrete construction method is difficult to control the quality of the concrete at the joints of walls, columns and beams, and the construction period is prolonged. [0003] Install the formwork according to the conventional method, and the construction sequence of the main structure of the short-limb shear wall and column is generally: binding the steel bars of the short-limb shear wall colu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00
Inventor 刘强张正天包宁军
Owner JIANGNAN CONSTR CO LTD DONGYANG ZHEJIANG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products