Evaluation method for design reasonability and operation period working state of arch dam body
A working state and evaluation method technology, applied in design optimization/simulation, electrical digital data processing, special data processing applications, etc., can solve problems such as difficulties, difficulties in program analysis and comparison, and no quantitative evaluation, and achieve convenient operation, The effect of evaluating the conclusion is accurate and usable, and the operation is simple
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0050] The solution of the present invention to solve the technical problem is: according to the calculation and analysis results of the arch dam or the displacement results of monitoring, the position of the maximum radial displacement of the dam body at each elevation is fitted as the center line of the radial displacement of the arch dam, and the center line and the vertical line As a quantitative index to characterize the symmetry of arch dam displacement, it is used to evaluate the rationality of arch dam shape design and the working status during operation. The details are as follows.
[0051] (1) Calculate the radial displacement of the node
[0052] There are three ways to obtain the radial displacement of the nodes in the grid, which are the monitoring method, the calculation of the arch beam sharing method, and the calculation of the finite element method.
[0053] 1) Monitoring method
[0054] The most commonly used method for arch dam displacement monitoring is t...
Embodiment 1
[0071] Below in conjunction with the calculation and analysis result of a certain project, the application of the present invention is further described:
[0072] For an extra-high arch dam project, for a certain body shape and dam foundation treatment design scheme, the stress and displacement of the dam body are calculated using the arch-beam load sharing method, and a total of 10 layers of nodes are divided.
[0073] (1) Extract the maximum radial displacement of each elevation of the arch dam
[0074] The radial displacement of each calculation node is shown in Table 1. The radial displacement is positive upstream and negative downstream. According to Table 1, using the comparison method, the maximum radial displacement of each layer node can be obtained as Table 2.
[0075] Table 1 Calculate the radial displacement of the node (cm)
[0076]
[0077]
[0078] Table 2 The maximum radial displacement of nodes in each layer (cm)
[0079] Tier 1 layer 2 ...