Transformer substation jump data monitoring method, device and system
A technology of jumping data and substations, applied in the direction of circuit devices, information technology support systems, electrical components, etc., can solve problems such as inability to identify abnormal data, unfavorable quality control of telemetry jump data, etc., and achieve the effect of improving the quality of telemetry data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] For ease of understanding, see figure 1 , an embodiment of a substation jump data monitoring method provided by the present application, including:
[0054] Step 101, the first telecontrol device collects telemetry values of monitored telemetry points.
[0055] Step 102, the first remote control device compares the telemetry value with the jump threshold, and if the telemetry value exceeds the jump threshold, sends request jump status information to the second remote control device that collects the telemetry value at the same time as the first remote control device.
[0056] Step 103, the first remote device receives the jump status signal returned by the second remote device according to the request jump status information, the jump status signal is in the jump state or not in the jump state.
[0057] Step 104, the first telecontrol device sends telemetry of the belt quality to the master station according to the jump state signal, and sends an alarm signal to the ...
Embodiment 2
[0062] For ease of understanding, see figure 2 and image 3 , the present application provides another embodiment of a substation jump data monitoring method, including:
[0063] Step 201, the first remote device continuously collects three telemetry values of the monitored telemetry points.
[0064] Step 202, the first telecontrol device calculates the first absolute value of the difference between the second telemetry value and the first telemetry value, compares the first difference absolute value with the jump threshold, if the first difference absolute value exceeds the jump threshold If the threshold is changed, the telemetry jump judgment time is started.
[0065] Step 203, the first telecontrol device calculates the second absolute value of the difference between the third telemetry value and the second telemetry value, and if the second absolute value of the difference exceeds the jump threshold, it is judged whether the direction of the two jumps is opposite , ...
example
[0075] figure 2 , the absolute value of the difference between the telemetry value h and telemetry g is greater than the jump threshold, the first telecontrol device starts the jump determination time t when receiving the telemetry value h, and the absolute value of the difference between the telemetry values i and h is greater than the jump threshold threshold, but it is consistent with the jump direction of telemetry h and telemetry g, then the telemetry value h is not jump data and will be transmitted to the master station with the original quality. This example corresponds to the process of normal power flow variation.
[0076] figure 2 , the absolute value of the difference between the telemetry values i and h is greater than the jump threshold, the first telecontrol device starts the jump determination time t when receiving the telemetry value h, and the absolute value of the difference between the telemetry values j and i is greater than the jump threshold , a...