A technology of jacking construction and steel box girders, which is applied in the direction of erecting/assembling bridges, bridges, bridge construction, etc., which can solve the problems of hindering the passage of expressway vehicles, increasing construction costs, and difficult construction, so as to achieve efficient construction and increase construction cost and reduce the difficulty of construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0033] see Figure 1-2 , a walking-type jacking construction method for assembling steel box girders spanning busy high-speed sections, including the following steps:
[0034] Step 1: The 260-ton crawler crane enters the site, the assembly brackets a-b and the push-up brackets a-c are installed, and the 75-ton truck crane is used to assemble the steel beam 1#--4# segment ground into a whole, and then use The 260-ton crawler crane hoisted the steel beam segmen...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thrust | aaaaa | aaaaa |