Method for calculating minimum thickness of karst cave top plate of karst pile foundation
A calculation method and pile foundation technology, applied in the direction of instruments, geometric CAD, electrical and digital data processing, etc., to achieve the effects of accurate results, rigorous theory, and simple programming
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2021-03-16
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a method for calculating the minimum thickness of a karst cave roof of a karst pile foundation, and belongs to the technical field of foundation bearing capacity analysis. Background technique
[0002] Southwest China is a karst development area, and karst phenomena such as karst caves, dissolution fissures, and soil caves exist in the karst development area, which adversely affects the stability of karst foundations. With the increasing scale of infrastructure construction in my country, the sites of many structure foundations are located in karst development areas; when there is a thick overburden in the karst site, and the strength of the overburden is low, it cannot be directly used as a bearing layer. , the pile foundation is often used as the foundation type for construction. However, due to the development of karst in the site, there are caves of a certain scale in the karst layer below the overburden. When the foundatio...
Examples
Embodiment 1
[0048] Example 1: as Figure 1-Figure 4 A method for calculating the minimum thickness of the karst cave roof of the karst pile foundation is shown in Figure 1. Taking the karst pile foundation as the research object, the force analysis of the karst pile foundation is carried out; the thickness of the karst cave roof is set as the objective function, combined with the And the equilibrium equation of the failure body of the karst cave roof, the constraints of shear failure and tensile failure of the failure surface of the karst roof, and the additional constraints of the interface between the pile and the roof, to establish a nonlinear mathematical program for solving the minimum thickness of the karst pile foundation foundation of the karst cave roof Model; use the interior point algorithm to solve the nonlinear mathematical programming model of the minimum thickness of the karst cave roof of the karst pile foundation, and obtain the minimum thickness of the karst pile foundati...