A rotary camera drill pipe for rock mass structure
A drill pipe and rock mass technology, which is applied in the field of rock mass structure rotary camera drill pipe, can solve problems such as unusable requirements, failure to achieve detection results, and inability to perform better rock mass surveys, etc., to achieve good detection operations and good rock mass surveys , good detection effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment one, such as Figure 1-3 As shown, a rock structure rotary camera drill pipe according to an embodiment of the present invention includes a drill pipe 1, a drill bit 2 is installed on one end of the drill pipe 1, and a symmetrical sleeve is installed on the outer side of the drill pipe 1. The first installation ring 3 and the second installation ring 4 that are compatible with the drill pipe 1, and the first installation ring 3 and the second installation ring 4 are compatible with each other, the first installation ring 3 and the second installation ring Both sides of 4 are equipped with fixed blocks 5, and threaded sleeves 6 are installed through the fixed blocks 5, and fixed bolts 7 compatible with the threaded sleeves 6 are installed through the inside of the threaded sleeves 6. The position corresponding to the fixing bolt 7 on the outer side of the drill pipe 1 is provided with a fixing hole 8 matching the fixing bolt 7, and the top of the installation ...
Embodiment 2
[0025] Embodiment two, such as figure 2 As shown, the model of the controller 20 is KY02S, and the controller 20 is electrically connected with the pressure sensor 19 and the motor 16; One side of block two 13 is equipped with built-in power supply 21, and described motor 16 and described controller 20 and described pressure sensor 19 are all powered by described built-in power supply 21; Described motor 16 is positive and negative motor; Can change A good rock mass structure detection operation, so as to better meet people's needs.
Embodiment 3
[0026] Embodiment three, such as figure 2 As shown, the side of the threaded block 17 away from the infrared camera 18 is equipped with a positioning pulley 22, and the inside of the installation groove 9 is provided with a position corresponding to the positioning pulley 22. The positioning chute 23 that matches the positioning pulley 22; can make the threaded sleeve block 17 achieve better stability, so as to facilitate better rock mass detection operations, and thus better meet people's needs need.