Calculation method of geological disaster meteorological early warning accuracy
A technology of geological disasters and calculation methods, applied to alarms, instruments, etc., can solve problems such as low calculation accuracy, achieve the effect of eliminating rainfall forecast errors and improving the accuracy of early warning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] see figure 1 As shown, the present invention provides a method for calculating the accuracy rate of meteorological early warning of geological disasters, which specifically includes the following steps:
[0056] S1. Determine the actual number of geological disasters that occurred during the early warning period, and calculate the level of geological disasters in each early warning unit one by one during the early warning period; the specific method is as follows:
[0057] Taking the early warning unit as the unit, take the range that the early warning unit ① extends outward by 1 / 2 as the statistical area, see figure 2 According to the number of geological hazards that actually occurred in each early warning unit within the early warning period, the geological hazard quantity level of each early warning unit can be determined (see Table 1);
[0058]
[0059] In the formula, T i is the cut-off value of the number of geological disasters, i is the number of geologic...
Embodiment 2
[0096] On the basis of Embodiment 1, the present invention provides a method for calculating the accuracy rate of meteorological early warning of geological disasters. Select 225km 2 In the research area, the early warning accuracy is 1:500,000 scale (5km*5km), and the research area involves 9 early warning units (see image 3 , l=5km), an early warning is issued every 24 hours, and the early warning period is 24 hours (daily). According to the current warning standards and practices, warnings are issued when yellow, orange and red warnings are generated, and no warnings are issued when blue warnings are generated.
[0097] Taking the early warning results of 1 day (24h) in the study area, calculate the total accuracy rate and rainfall forecast accuracy rate within the early warning period, and then calculate the geological disaster meteorological early warning accuracy rate excluding rainfall forecast errors. The specific calculation process is as follows:
[0098] S1. Dete...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com