Triangular area construction method of open-web rigid frame bridge
A construction method and technology of triangular area, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of long construction period, lengthened construction period, upper and lower chord construction interference, etc., to shorten the construction period, reduce the construction difficulty, simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The technical solution of the present application will be clearly and completely described below in conjunction with specific embodiments. Apparently, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present application.
[0047] The present application discloses an embodiment of a construction method for a triangular area of a hollow rigid frame bridge. The triangular area is enclosed by concrete pier columns 10 and upper chord segments and lower chord segments located on both sides of the concrete pier columns 10 . The upper chord segment and the lower chord segment on each side of the concrete pier 10 are n sections, including steps:
[0048] Such as figure 1 As shown, the lower chord initial section bracket...