Unlock instant, AI-driven research and patent intelligence for your innovation.

Prefabricated concrete ring beam-floor connection structure based on PBL connection and installation method

A technology of prefabricated concrete and installation method, which is applied in the direction of building construction and construction, can solve the problems of poor durability and comfort, achieve good durability and comfort, reduce pollution, and design rationally

Pending Publication Date: 2021-04-23
CHINA RAILWAY CONSTR GROUP
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing steel structure floor has certain advantages in node connection structure and installation method, but the steel structure floor is poor in durability and comfort. Based on this, this application proposes a precast concrete ring beam-floor connection based on PBL connection Construction and installation method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated concrete ring beam-floor connection structure based on PBL connection and installation method
  • Prefabricated concrete ring beam-floor connection structure based on PBL connection and installation method
  • Prefabricated concrete ring beam-floor connection structure based on PBL connection and installation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0023] see Figure 1~5 , a precast concrete ring beam-floor connection structure based on PBL connection, including a transverse ring beam 1, a longitudinal ring beam 2, an inner ring beam 3, a prefabricated floor 4 and an upper wall 5; the transverse ring beam 1 and the longitudinal ring beam 2. The inner side of the longitudinal ring beam 2 is provided with a parallel inner ring beam 3, and the longitudinal ring beam 2 is provided with a ring beam reserved f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a prefabricated concrete ring beam-floor connection structure based on PBL connection and an installation method. The structure comprises a transverse ring beam, a longitudinal ring beam, an inner ring beam, a prefabricated floor, an upper-layer wall, ring beam reserved floor supporting surfaces, a ring beam-upper shear wall pre-embedded part, a ring beam-lower shear wall pre-embedded part, a transverse-longitudinal ring beam connecting pre-embedded part, a prefabricated floor hand hole, and a floor connecting rabbet. The prefabricated concrete ring beam-floor connection structure based on PBL connection has the beneficial effects that on-site wet operation is abandoned, and the advantages of saving resources, protecting the environment and reducing pollution of a prefabricated building technology are exerted to the maximum extent. According to the installation method, the floor supporting surfaces is reserved on the ring beams, after the ring beams are installed, a floor is supported by the ring beams and can be directly erected on the ring beams, and the bottom of the floor does not need to be supported in installation. The adjacent floors adopt a tongue-and-groove method to ensure that joints between the floors are closely spliced. Adjacent floors are connected by the rabbet, so that close splicing between the joints of the floors is ensured. Compared with a steel structure house commonly adopted by middle and low-rise buildings, the connection structure has better durability and comfort.

Description

technical field [0001] The invention relates to a ring beam-floor connection structure, in particular to a prefabricated concrete ring beam-floor connection structure and an installation method based on PBL connection, and belongs to the technical field of construction engineering applications. Background technique [0002] PBL connection is a kind of shear connector embedded in concrete. It has been used in the field of bridges, and it is used for the first time in prefabricated components of house construction. The PBL connection has large bearing capacity, good ductility, easy and quick installation, and has the property of secondary use after disassembly, which is friendly to the environment. Mass production costs are lower. [0003] The connection between the ring beam and the floor slab in the existing prefabricated concrete building still retains the method of pouring concrete at the connection point, which does not have the function of turnover. The existing steel ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/38E04B1/41
CPCE04B1/38E04B1/41
Inventor 董磊张亚齐殷炳帅曹青王宽侯立群王庆彬张永辉
Owner CHINA RAILWAY CONSTR GROUP