Data exception processing method and device, storage medium and electronic equipment
A technology of data anomalies and processing methods, which is applied in the field of big data, can solve problems such as slow query speed, waste of manpower, time and equipment resources, and reduce computer use efficiency, so as to simplify the recognition process and improve recognition accuracy and efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] figure 1 It is a schematic flow chart of a data anomaly processing method provided in Embodiment 1 of the present invention. This embodiment is applicable to quickly determine the source task that causes data anomalies. This method can be executed by the data anomaly processing device provided in the embodiment of the present invention. The device can be realized by means of software and / or hardware. Specifically include the following steps:
[0025] S110. When it is determined that the data is abnormal, invoke the task relationship tree of each scheduling task used to complete the data. The task relationship tree includes the parent-child relationship of each scheduling task and the completion status of each scheduling task.
[0026] S120. Determine the bottom-level abnormal scheduling task in the task relationship tree.
[0027] S130. Based on the task relationship tree, determine the exception source task according to the completion status of at least one parent ta...
Embodiment 2
[0041] Figure 4 It is a schematic flow chart of a data exception processing method provided by the embodiment of the present invention, which is optimized on the basis of the above embodiments, and the method specifically includes:
[0042] S210. Monitor the completion status of each scheduling task, and update the task relationship tree according to the completion status of each scheduling task.
[0043] S220. When it is determined that the data is abnormal, invoke the task relationship tree of each scheduling task used to complete the data. The task relationship tree includes the parent-child relationship of each scheduling task and the completion status of each scheduling task.
[0044] S230. Determine the bottom-level abnormal scheduling task in the task relationship tree.
[0045] S240. Based on the task relationship tree, determine the exception source task according to the completion status of at least one parent task of the underlying exception scheduling task.
[0...
Embodiment 3
[0053] Figure 5 It is a schematic structural diagram of a data exception processing device provided in Embodiment 3 of the present invention. The device includes a task relationship tree calling module 310, a bottom-level exception scheduling task determination module 320, and an exception source task determination module 330, wherein:
[0054] The task relationship tree calling module 310 is used to call the task relationship tree of each scheduling task used to complete the data when it is determined that the data is abnormal, the task relationship tree includes the parent-child relationship of each scheduling task, and each of the scheduling tasks the completion status of the task;
[0055] The underlying abnormal scheduling task determination module 320 is configured to determine the underlying abnormal scheduling task in the task relationship tree;
[0056] The exception source task determination module 330 is configured to determine the exception source task based on t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


