Coal roadway crossing gas control drill hole design calculation method
A technology of design calculation and drilling through layers, applied in design optimization/simulation, geometric CAD, special data processing applications, etc., can solve problems such as no intelligent drilling design
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] see Figure 1-12 : A coal roadway cross-layer gas prevention and control drilling design calculation method, the calculation method includes:
[0039] S1. Determination and design of the design model of the pre-pumping coal roadway through-layer drilling;
[0040] S11. Drilling design through layers:
[0041] Design according to the database, rule base, and output parameters; the database in the layer-crossing drilling design in S11 includes spatial coordinate determination, extraction parameters, coal seam thickness, coal seam inclination, gas content, gas pressure, and construction drilling site; rule base Including drilling inclination, drilling azimuth, roadway azimuth, drilling length calculation, drilling opening position, drilling end hole position, and determination of the number of drilling holes; output parameters include drilling inclination, drilling azimuth, roadway azimuth Angle, drilling length, drilling opening point coordinates, drilling end point coo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


