Dam frost heaving prevention protection structure and construction method
A protective structure and construction method technology, applied in dikes, dams, water conservancy projects, etc., can solve the problems of consuming a lot of manpower, material resources and time, the effect of maintenance is not obvious, and the time lag of repair, etc., to achieve convenient maintenance and cleaning, Solve the high maintenance cost and reduce the effect of extrusion damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as Figure 9 , 10 As shown, a dam anti-frost heaving protective structure includes several protective plates 3, and several protective plates are arranged on the water-facing side in sequence along the length direction of the dam, and there are gaps between adjacent two protective plates to form expansion joints 10; each Anchor holes are opened on each of the protective plates, and each protective plate is fixed on the slope of the embankment by inserting anchor rods in the anchor holes. The top of each protective plate in the length direction is set close to the top of the embankment, and the bottom end is fixed to slope;
[0051] Several protective holes 2 are spaced apart on each protective plate, and the protective holes are arranged along the length direction of the protective plate; the protective plate is cut in half along the width direction along the longitudinal section passing through the central line of the protective plate width direction, and from th...
Embodiment 2
[0080] Such as Figure 7 , 8 As shown, a dam anti-frost heave protection structure includes several protective plates 3, and several protective plates are arranged on the water-facing side along the length direction of the dam in turn, and there is a gap between two adjacent protective plates to form an expansion joint 10, and Two adjacent fenders are connected by a three-axis hinge in the width direction of the fenders, the top of each fender in the length direction is set close to the top of the embankment, and the bottom end of each fender in the length direction is located at the bottom of the embankment; each fender is spaced Several protective holes 2 are provided, and the protective holes are arranged along the length direction of the protective plate. The distance between the protective hole at the bottom and the top of the protective plate is determined according to the effective depth. The vertical distance between the lower surface of the bottommost protective hole...
Embodiment 3
[0091] A construction method for an anti-frost heave protective structure of a dam, comprising the following steps:
[0092] Step 1. First survey and measure parameters of the embankment slope on site, including slope slope, slope elevation, form and thickness of the original slope protection device, etc. Collect the water level height, ice thickness pattern and maximum ice thickness over the years.
[0093] The parameter k is calculated according to the collected water depth and maximum ice thickness, when Yes, use the protective structure of Embodiment 1, that is, the protective plate is connected to the embankment through anchor holes and anchor rods. when , the protective structure of Embodiment 2 is used, that is, the bottom end of the protective plate is fitted with the bottom support plate.
[0094] Step 2: Determine the size of a single protective hole according to the slope angle and the thickness of the protective plate, and then determine the number of protecti...