Landslide monitoring and early warning method and system based on second-order work
A monitoring and early warning, monitoring center technology, applied to alarms, instruments, etc., can solve problems such as lack of scientific basis and blindness, and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Please refer to figure 1 with 8 , a landslide monitoring and early warning method based on second-order work, comprising steps:
[0037] S1. Several sensors in the data acquisition device respectively collect the stress data and strain data of the landslide to be monitored, and send them to the monitoring center;
[0038] The actual use includes the following steps:
[0039] a, select the middle and lower part of the potential landslide body as the landslide disaster monitoring and early warning area, according to the previous site survey, determine the position of the borehole in the area to be monitored to carry out the drilling operation, and the borehole diameter is slightly larger than the outer diameter of the thin-walled open metal cylinder;
[0040] b. In the area of the slope to be monitored, the data acquisition devices are arranged in the style of plum blossom piles, with a spacing of 2.0 to 3.0m, arranged in 2 to 5 rows, and the number of each row is 3 t...
Embodiment 2
[0061] Please refer to Figure 2-7 , a landslide monitoring and early warning system 1 based on second-order work, including a data acquisition device 2 and a monitoring center 3;
[0062] The data acquisition device 2 includes a metal cylinder 4, several sensors and an anti-interference signal transmission cable 7;
[0063] The anti-interference signal transmission cable 7 is arranged inside the metal cylinder 4;
[0064] The sensor includes a stress sensor 5 and a strain sensor 6, and the stress sensor 5 and the strain sensor 6 are alternately arranged on the metal cylinder 4, and are respectively electrically connected to the anti-interference signal transmission cable 7;
[0065] The anti-interference signal transmission cable 7 is electrically connected to the monitoring center 3;
[0066] Several sensors in the data acquisition device 2 respectively collect stress data and strain data of the landslide to be monitored, and send them to the monitoring center 3;
[0067]...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


