Construction method of novel conversion system of special-shaped pier tower hydraulic creeping formwork

A hydraulic climbing formwork and construction method technology, which is applied to bridge parts, erection/assembly bridges, bridges, etc., can solve the problems of flexible rods of the upper frame, deformation of the formwork, impact on the construction period, high requirements for the stacking site, etc., and achieve the work intensity of replacement and disassembly Small size, improved construction efficiency, and guaranteed safety

Active Publication Date: 2021-06-22
ZHEJIANG COMM CONSTR GRP CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003]Conventional system conversion is usually to manually cooperate with the tower crane to remove all the frames on the hydraulic climbing formwork, hoist it to the site under the bridge to adjust the angle, and then re-install it. This method There are the following problems: (1) It is easy to cause deformation of the flexible rods and templates of the upper frame
(2) The risk of high-altitude operation is high for the operators who install the lower frame, and the requirements for the stacking site are high
(3) The workload of reassembly and disassembly of the frame is too large, the construction time is long, the efficiency is low, and the construction period is seriously affected

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of novel conversion system of special-shaped pier tower hydraulic creeping formwork
  • Construction method of novel conversion system of special-shaped pier tower hydraulic creeping formwork
  • Construction method of novel conversion system of special-shaped pier tower hydraulic creeping formwork

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] Such as Figure 1-6 The structure diagram of the new conversion system of the hydraulic climbing form shown includes the upper frame body 1, the formwork structure 2, the main platform load-bearing connection structure 3, the attached tower hydraulic sliding structure 4, the lower frame body 5, the formwork brace 6, the formwork 7, the sliding Platform 8, embedded parts 10, embedded parts hanging seat 11, guide rail 12, hydraulic drive device 13, tripod beam 14, tripod brace 15, tripod pole 16, pin hinge 17, Y-shaped tower column 25, Middle tower column conversion foundation section 26, upper tower column conversion foundation section 28, etc. The new hydraulic climbing formwork conversion system is mainly composed of upper frame body 1, formwork structure 2, main platform load-bearing connection structure 3, and attached tower hydraulic sliding structure 4 and the lower frame body 5, the new conversion system of the hydraulic climbing formwork is basically the same as ...

Embodiment 2

[0060] This patent also provides a construction method for a new conversion system of hydraulic climbing formwork, including the following steps:

[0061] (1) Universal configuration and numbering of hydraulic climbing formwork: According to the section size of the lower tower column section of Y-shaped tower column 25, a general-purpose hydraulic climbing formwork new conversion system is equipped on each side of the pier tower, and four for Y-shaped tower column 25 The hydraulic climbing formwork on the surface is numbered, the upper frame body 1 in the direction of the transverse bridge is numbered A1, A2 and B1, B2 respectively, and the lower frame body 5 in the direction of the transverse bridge is respectively numbered A1', A2', B1', B2', and the The upper frame body 1 in the bridge direction is respectively numbered C1, C2 and D1, D2, and the lower frame body 5 along the bridge direction is respectively numbered C1', C2', D1', D2'.

[0062] (2) Embedded parts pre-embedd...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of a novel special-shaped pier tower hydraulic creeping formwork conversion system. The construction method comprises the following steps: S1, preparing and numbering the hydraulic creeping formwork; S2, embedding the embedded part; performing S3, foundation section concrete pouring; S4, cleaning the creeping formwork platform; S5, enabling the frame body on the A1 face to be detached to fall to the ground; S6, lifting a lower frame body A1'; S7, installing an upper frame body B1 and lifting the B1'; S8, installing an upper frame body B2 and lifting a lower frame body B2'; S9, installing an upper frame body A2 and lifting the lower frame body A2'; S10, installing the upper frame body A1; S11, conducting climbing construction along a bridge direction hydraulic climbing formwork; S12, binding reinforcing steel bars and pouring concrete. The invention has the beneficial effects that the novel creeping formwork conversion system is adopted at the variable cross section of the tower column for cyclic replacement and disassembly, the purpose of system conversion is achieved, only one upper frame body needs to be lifted to the ground, the lower frame bodies continue to be lifted and fixed, and the other surfaces are cyclically replaced, disassembled and installed with the lower frame bodies lifted one by one as the basis.

Description

technical field [0001] The invention relates to a construction method for a new conversion system of hydraulic climbing formwork for special-shaped pier towers, and is mainly suitable for the conversion construction of hydraulic climbing formwork systems for "A-type", "H-type" and "Y-type" special-shaped pier towers. Background technique [0002] With the deepening of concepts such as "landscaping" and "integrating scenery", bridges crossing V-shaped valleys in mountainous areas are often designed as cable-stayed bridges, and the structural forms of cable-stayed bridge piers are also various, mainly including "A-shaped", "H type", "Y type" and so on. According to different pier tower structures, the crossing of pier towers or the consolidation positions of tower girders are different, and the construction techniques are different. The pier towers or tower girders can be constructed in "synchronous" and "asynchronous" constructions. When the intersection or tower beam is con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D19/14E01D19/02
CPCE01D21/00E01D19/14E01D19/02
Inventor 宋德洲翁杨姚正权舒丹黄称应超浩龙争鸣罗艺阳
Owner ZHEJIANG COMM CONSTR GRP CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More