Overall assembly jacking construction method for grid floor support plate structure in limited space
A technology of limited space and construction method, applied in the direction of floor slab, building components, building structure, etc., can solve the problems of low construction efficiency and great potential safety hazards, achieve simple and convenient construction, reduce the danger of high-altitude work, construction safety and safety. efficient effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain related inventions, rather than to limit the invention. It should also be noted that, for ease of description, only parts related to the invention are shown in the drawings.
[0021] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and embodiments.
[0022] refer to Figure 1 to Figure 5 As shown, the present invention provides a construction method for overall assembly and jacking of a grid floor deck structure in a confined space, which includes the following steps:
[0023] S1: Divide the grid floor deck structure into a pre-assembly area 1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


