Connecting structure for concrete pipe pile installation

A technology for concrete pipe piles and connection structures, which can be used in foundation structure engineering, sheet pile walls, buildings, etc., and can solve problems such as trouble, easy corrosion of connection components, installation and transportation, etc.

Inactive Publication Date: 2021-07-06
史赟
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the problems in the prior art that the connecting components are easy to corrode and the installation and transportation are troublesome, and propose a connection structure for the installation of concrete pipe piles

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Connecting structure for concrete pipe pile installation
  • Connecting structure for concrete pipe pile installation
  • Connecting structure for concrete pipe pile installation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] Embodiment one, such as Figure 1-9 As shown, a connection structure for the installation of concrete pipe piles, including a horizontal installation base 1, the installation base 1 is fixedly connected to the ground, the installation base 1 is a half-open cylinder, and the installation base 1 is vertically arranged A plurality of concrete pipe piles 2, the concrete pipe piles 2 are annular, the bottom surfaces of the plurality of concrete pipe piles 2 are all provided with first connecting grooves 3, and the upper surfaces of the plurality of concrete pipe piles 2 are all fixedly connected with connecting rings 4, the second A connection groove 3 is annular to match the connection ring 4, and a plurality of concrete pipe piles 2 are connected end to end, and the inner bottom surface of the installation base 1 is provided with a second connection groove 5, and the second connection groove 5 is matched with the connection ring 4 The ring 4 of the lowermost concrete pipe ...

Embodiment 2

[0033] Embodiment two, such as figure 1 , 2, 7, the first clamping mechanism 6 includes a groove 7 arranged on the inner surface of the side wall of the installation base 1, and a vertical sliding piece 8 is slidably connected in the groove 7, and the sliding piece 8 faces the port of the groove 7. One side is fixedly connected with the first block 9, and the sliding piece 8 is fixedly connected with the inner wall of the groove 7 through the first spring 10 arranged horizontally. The inner surface of the sliding piece 8 is fixedly connected with a steel wire 11, and the first spring 10 is wound on the steel wire. 11, the steel wire 11 runs through the side wall of the installation base 1 and is slidably connected with it. The first pull ring 12 is sleeved on the outside of the installation base 1. The first pull ring 12 is fixedly connected with multiple steel wires 11, and multiple concrete pipe piles 2 The outer surface is provided with a first card slot 13 that fits with ...

Embodiment 3

[0034] Embodiment three, such as Figure 1-5 As shown, the lower ends of the outer walls of a plurality of concrete pipe piles 2 are fixedly connected with a first fixing ring 14, and the upper ends of the outer walls of a plurality of concrete pipe piles 2 are fixedly connected with a second fixing ring 15, and the first fixing ring 14 at the top is connected with the first fixing ring 14 at the bottom. A fixing ring 16 is arranged between the second fixing ring 15 of the second fixing ring 16, and the fixing ring 16 is in contact with the first fixing ring 14 and the second fixing ring 15 above and below, and the fixing ring 16 is sleeved at the joint of the two concrete pipe piles 2 , the fixing ring 16 is slidingly connected with the two concrete pipe piles 2, the upper surfaces of multiple second fixing rings 15 are all fixedly connected with a plurality of vertically arranged fixing columns 17, and the lower surfaces of the plurality of fixing rings 16 are all provided wi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a connecting structure for concrete pipe pile installation. The connecting structure comprises a horizontally arranged installation base, the installation base is fixedly connected with the ground, the installation base is in a semi-open cylinder shape, a plurality of concrete pipe piles are vertically arranged above the installation base, the concrete pipe piles are in a circular ring shape, first connecting grooves are formed in the bottom faces of the multiple concrete pipe piles, connecting rings are fixedly connected to the upper surfaces of the multiple concrete pipe piles, the first connecting grooves are in a ring shape matched with the connecting rings, the multiple concrete pipe piles are connected end to end, second connecting grooves are formed in the inner bottom face of the installation base, and the second connecting grooves are in a ring shape matched with the connecting rings. Traditional screws and nuts are replaced by a clamping mode, so that the device is more convenient to connect and fix, meanwhile, the connecting strength is not affected by corrosion, the concrete pipe piles are decomposed into a multi-section structure, transportation is facilitated, meanwhile, installation is more convenient and safer, and practicability is higher.

Description

technical field [0001] The invention relates to the technical field of concrete pipe piles, in particular to a connection structure for installing concrete pipe piles. Background technique [0002] At the end of the 1960s, the Fengtai Bridge Factory of the Ministry of Railways began to produce pre-tensioned prestressed concrete pipe piles (referred to as PC pipe piles), which were mainly used for the foundation construction of railway bridge projects. In the 1970s, post-tensioned prestressed concrete pipes were developed and produced. pile. [0003] Most of the existing concrete pipe piles are fixedly connected by screws. This connection method is easy to affect the connection effect due to corrosion over time, and most of the existing concrete pipe piles are monolithic structures with large lengths, making Both installation and transportation are troublesome. Therefore, in order to solve the above problems, a connection structure for installing concrete pipe piles is propo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/30E02D5/52
CPCE02D5/30E02D5/523E02D5/526
Inventor 史赟
Owner 史赟
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products