Embodiment 1
[0028] The main substation supplies power to the traction substation and the step-down substation through the medium-voltage power supply network, so that the traction substation and the step-down substation can carry out normal power transmission. The camera monitors the status of the rail traffic in real time. In the event of a failure, an early warning will be issued, and the system will deploy personnel to rescue and rescue. At the same time, the monitored part will be stored in the playback module for later viewing.
Embodiment 2
[0030] In this embodiment, the camera of the monitoring device is made up of various high-sensitivity sensors instead, and is used to monitor the real-time status on the line;
[0031] The main substation supplies power to the traction substation and the step-down substation through the medium-voltage power supply network, so that the traction substation and the step-down substation can carry out normal power transmission. The sensor monitors the status of the rail transit in real time. In the event of a failure, an early warning will be issued, and the system will deploy personnel to rescue and rescue. At the same time, the monitored part will be stored in the playback module for later viewing.
Embodiment 3
[0033] In this embodiment, the camera of the monitoring device is replaced by a three-phase integrated current transformer, which is used to monitor the real-time status on the line;
[0034] The main substation supplies power to the traction substation and the step-down substation through the medium-voltage power supply network, so that the traction substation and the step-down substation can carry out normal power transmission, and the three-phase integrated current transformer monitors the rail transit in real time When there is a fault, an early warning will be issued, and the system will deploy personnel to rescue. At the same time, the monitored part will be stored in the playback module for later viewing.