Primary frequency modulation test system and method for new energy station
A test system and test method technology, applied in the direction of measuring electricity, measuring devices, measuring electrical variables, etc., can solve the problems of no good test technical means for frequency modulation testing, heavy manual configuration workload, low degree of automation, etc., to achieve test means Flexible and convenient, reliable test results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0047] like Figure 1-2 As shown, the primary frequency regulation devices of wind turbines and photovoltaic units in new energy stations are tested respectively. When in use, the primary frequency regulation test system of new energy stations is built. The primary frequency regulation test system of new energy stations controls the output through hard wiring The current and voltage are connected to the primary frequency modulation device, and are connected to the primary frequency modulation device through a network cable to realize network information interaction. And carry out various test items of the frequency modulation device.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com