Ballastless track of heavy-duty railway tunnel group and construction method thereof
A ballastless track and tunnel group technology, applied in the direction of track, movable track, laying track, etc., can solve the problem that the accurate detection and maintenance of loose fasteners cannot be realized, and achieve the effect of convenient maintenance process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Embodiment 1: The embodiment of the present application discloses a ballastless track for a heavy-duty railway tunnel group.
[0047] refer to figure 1, the ballastless track of the heavy-duty railway tunnel group includes a concrete base 1 , several track slabs 2 and two rows of straight steel rails 3 . Several track slabs 2 are divided into two rows, and are arranged side by side at equal distances and laterally on the concrete base 1 to realize the support of the steel rails 3 .
[0048] refer to figure 1 , figure 2 The upper end surfaces of both ends of the track plate 2 are provided with a pair of shoulders 21 . The rails 3 are laid on the track plate 2 and are located between each pair of shoulders 21 to realize the limit of the rails 3 . A pair of fasteners 22 are disposed between each pair of shoulders 21 . The pair of fasteners 22 are distributed on both sides of the rail 3 and press against the side walls of the lower ends on both sides of the rail 3 .
...
Embodiment 2
[0074] Embodiment 2: The embodiment of the present application discloses a construction method of a ballastless track for a heavy-duty railway tunnel group.
[0075] The construction method of the ballastless track of the heavy-duty railway tunnel group comprises the following steps:
[0076] S1, install the reinforcing bars of the ballast floor, and pour the bottom concrete;
[0077] S2, install basic reinforcement bars, concrete base 1, and maintain concrete base 1;
[0078] S3, laying the prefabricated track slab 2 on the concrete base 1 at equal distances, and pouring concrete to fix the track slab 2;
[0079] S4, laying the rail 3, and calibrating the rail 3;
[0080] S5, install the fastener 22, and fasten the bolt 23 into the embedded pipe 24 on the track plate 2 to realize the fixing of the fastener 22 and the rail 3;
[0081] S6, install the air bag 5, and fill the detection liquid with color into each air bag 5;
[0082] S7 , install the feedback tube 6 , and fil...