Steel structure elevator shaft welding tool
A technology for elevator shafts and welding tooling, applied in welding equipment, auxiliary welding equipment, welding/cutting auxiliary equipment, etc., can solve problems such as unfavorable welding work, low welding efficiency, and fatigue of welding workers, so as to ensure safety and work comfort performance, improve welding efficiency and prolong service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] combined with Figure 1-12 , a steel structure elevator hoistway welding tool, including a slide rail group 1, a support frame 2, a driving support frame 3, an auxiliary support frame 4, a welding frame 5, and a control box 6, and the slide rail group 1 includes a main slide rail 11, Horizontal slide rail 12, described horizontal slide rail 12 is fixedly installed on main slide rail 11 both sides, and described driving support frame 3, auxiliary support frame 4, welding frame 5 are all made on the structural basis of support frame 2, One end of the main slide rail 11 is fixedly installed with a drive support frame 3, the control box 6 is installed on the drive support frame 3, the limit hydraulic rod device 7 is installed on the drive support frame 3, and the sliding installation on the main slide rail 11 Auxiliary support frame 4, welding frame 5 is slidably installed on the transverse slide rails 12 on both sides of the main slide rail 11, and connecting frame 8 is in...
Embodiment 2
[0039] When the device is in use, firstly adjust the distance between the auxiliary support frame and the drive support frame according to the length of the elevator shaft to be welded, weld the main supporting parts of the elevator shaft to be welded on the connecting frame through angle iron, and then weld each The branch parts are welded to the supporting parts in this way. After the elevator shaft welding on one side is completed, the two welding frames are controlled to move away from the two sides through the control box so that the connecting frame can rotate normally. After the connecting frame rotates to the next welding surface, the two welding frames move towards each other. Return to the welding position to continue welding, and complete the welding work of each part of the elevator shaft in turn.