PTC pipe pile and its construction method based on cpdb technology and movable anti-blocking device
A construction method and movable technology, applied in foundation structure engineering, sheet pile walls, soil protection, etc., can solve problems such as unfavorable construction, foundation stability, and insufficient vertical drainage efficiency, and achieve foundation disturbance and operational difficulties, Extensive engineering application value, simple operation effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0041] The reference signs in the drawings of the description include: prefabricated reinforced concrete pipe 1, main drainage channel 2, horizontal hole 3, capillary permeable drainage belt 4, inner metal interlayer 5, outer metal interlayer 6, movable metal partition 7, concrete pile cap 8 , guide groove 9.
[0042] The prefabricated reinforced concrete drainage pipe pile is mainly composed of a prefabricated reinforced concrete pipe 1, a main drainage channel 2, a horizontal hole 3 and a capillary permeable drainage belt 4. The main drainage channel 2 is located at the axis of the prefabricated reinforced concrete pipe 1, a number of horizontal holes 3 are symmetrically distributed on the pipe wall of the prefabricated reinforced concrete pipe 1 along the circumferential direction, and capillary permeable drainage strips 4 are respectively laid in ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


