Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method, system and equipment for pre-starting operation environment installation and medium

An operating environment and pre-start technology, applied in the field of cloud computing, can solve the problem of not supporting bare metal deployment, and achieve the effect of a solid technical foundation

Active Publication Date: 2021-09-21
济南浪潮数据技术有限公司
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, since OVN (Open Virtual Network, open virtual network) does not support bare metal deployment, it has not yet opened up the deployment node TFTP-SERVER to the deployment network and opened up the intelligent The method of network card pf0hpf (the port corresponding to PF0 generated by the network card on the bare metal system) to the deployment network

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method, system and equipment for pre-starting operation environment installation and medium
  • Method, system and equipment for pre-starting operation environment installation and medium
  • Method, system and equipment for pre-starting operation environment installation and medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the object, technical solution and advantages of the present invention clearer, the embodiments of the present invention will be further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings.

[0023] It should be noted that all expressions using "first" and "second" in the embodiments of the present invention are to distinguish two entities with the same name but different parameters or parameters that are not the same, see "first" and "second" It is only for the convenience of expression, and should not be construed as a limitation on the embodiments of the present invention, which will not be described one by one in the subsequent embodiments.

[0024] According to the first aspect of the embodiments of the present invention, an embodiment of a method for pre-starting the installation of the operating environment is proposed. figure 1 What is shown is a schematic diagram of an embodiment of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method, a system and equipment for installing a pre-start running environment, and a storage medium. The method comprises the following steps: deploying Openstack at a deployment node, and installing a network card at a bare metal node; respectively creating a first network port and a second network port of a deployment network at the deployment node, adding the second bare metal port to a first network bridge of the bare metal node, binding a unique identification code of the first network port to the second bare metal port, and issuing flow tables of the first network port and the deployment network to the first network bridge at the bare metal node; creating a second network bridge at the deployment node, setting the mac address of the second network bridge as the mac address of the second network port, binding the unique identification code of the second network port to the second network bridge, and issuing the flow table of the second network port and the deployment network to the second network bridge at the deployment node; and receiving a request of installing according to the pre-starting operation environment sent by the bare metal node at the deployment node based on the first network bridge and the second network bridge, and installing according to the request.

Description

technical field [0001] The present invention relates to the field of cloud computing, and more specifically, to a method, system, computer equipment and readable medium for pre-booting and installing a running environment. Background technique [0002] With the rapid development of the cloud computing field, Bare Metal Service is a computing service that combines the flexibility of virtual machines and the performance of physical machines. It can provide individuals or enterprises with dedicated physical servers on the cloud. It can provide excellent computing performance and ensure data security for key application systems, high-performance computing, big data, core database and other businesses. When creating a bare metal cloud physical machine, just like creating a virtual machine, you only need to specify the required hardware requirements (such as: cpu memory, etc.), image, and required network to create the required bare metal cloud physical machine. And users can app...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F9/455
CPCG06F9/45558G06F2009/45595G06F2009/45575G06F2009/4557G06F2009/45583G06F2009/45562
Inventor 刘元锋
Owner 济南浪潮数据技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products