Construction method of fixed measurement control points for hydraulic reclamation site
A technology of measurement control and construction method, which is applied in infrastructure engineering, construction, etc., can solve problems such as uneven settlement, poor stability, and offset, and achieve the effects of improving stability, good stability, and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] A construction method for fixed measurement control points for dredger filling sites, which is specifically applied to the Zhongtian sintering project, and the specific steps are as follows:
[0031] (1) According to the general planning of the project, select a plot without buildings, use an excavator to level a 2.5m*2.5m site, and manually compact it;
[0032] (2) Use machinery to drive 4 steel pipe piles 2 (galvanized steel pipes with a length of 3m and a diameter of 200mm) on the site. The 4 steel pipe piles 2 are evenly distributed around the center circumference of the site and the steel pipe piles 2 are exposed to the ground for 100mm long;
[0033] (3) Bind the steel mesh sheets connected with the steel pipe piles on the four steel pipe piles 2, and then install the combined embedded parts (ie M-1 iron parts) at the centers of the four steel pipe piles and adjust the installation flatness (that is, to ensure the flatness of its installation), the combined embed...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com