[0043] In order to achieve the above object, the present embodiment proposes a method, comprising the following steps:
[0044] (1) Level the site for the excavation section of the cutting, carry out measurement and setting out, measure and release the middle pile of the route, and excavate the upper edge pile of the cutting;
[0045] (2) Manually cooperate with excavators, bulldozers and loaders to clear the surface of the subgrade within the project scope, and transport the cleared topsoil to the designated place for centralized stacking, and use it as the later site recultivation or backfill planting soil;
[0046] (3) According to the re-measured original ground elevation, stake out according to the pile number spacing of the cross section on the design drawing, determine the excavation positions of the middle pile, side pile, broken down platform and cutting top, keep track and measure, and ensure that the slope One-time molding and meet design and specification requireme...