Distribution network load prediction device and method based on user installation and plot
A load forecasting and user technology, applied in forecasting, data processing applications, instruments, etc., can solve the problems of increasing the labor burden of staff, heavy manual operation workload, and no centralized management and storage, so as to facilitate calling and viewing, avoid The effect of checking errors and reducing labor burden
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A distribution network load forecasting method based on user reports and plots, comprising the following steps: Step 1, forecast input; Step 2, data retrieval; Step 3, data screening; Step 4, line prediction; Step 5, substation prediction ; Step six, town street forecast; Step seven, district bureau forecast; Step eight, forecast output;
[0035] In the above step 1, the year to be predicted is input from the forecast input module 1 as June 2021, and then the forecast input module 1 determines that the data interval to be selected is from July 2020 to June 2021, and the instruction is transmitted to In the data storage module 2;
[0036]In the above-mentioned step 2, the data storage module 2 searches for the potential user data table from July 2020 to June 2021, the submitted user data table from July 2020 to June 2021, and the 2020 Archived user data table from July to June 2021, natural growth rate data in 2021, industry stage coefficient parameter setting data, 10k...
Embodiment 2
[0044] A distribution network load forecasting method based on user reports and plots, comprising the following steps: Step 1, forecast input; Step 2, data retrieval; Step 3, data screening; Step 4, line prediction; Step 5, substation prediction ; Step six, town street forecast; Step seven, district bureau forecast; Step eight, forecast output;
[0045] In the above step 1, the year to be predicted is input from the forecast input module 1 as June 2021 to June 2025, and then the forecast input module 1 determines that the data interval to be selected is from July 2020 to June 2021 , and the instruction is transmitted to the data storage module 2;
[0046] In the above-mentioned step 2, the data storage module 2 searches for the potential user data table from July 2020 to June 2021, the submitted user data table from July 2020 to June 2021, and the 2020 Archived user data table from July to June 2021, natural growth rate data from 2021 to 2025, industry stage coefficient param...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com