Construction process and device for connecting channel structure of high-rise building

A technology for high-rise buildings and connecting channels, which is applied in the direction of building construction, construction, and building material processing, and can solve problems such as the impact of connection strength, damage to building connection points, and impact on building life, and achieve obvious beneficial effects

Pending Publication Date: 2021-11-26
JUJIANG CONSTR GRP
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the problem is that there will be a certain amount of shaking between high-rise buildings. When affected by slight ground vibrations and high-altitude winds, the higher the floor, the more obvious the shaking will be, which will lead to subsequent increased connection channels. Due to the unbalanced shaking of the two buildings, the connection strength is affected. After long-term use, it is easy to cause damage to the connection points of the buildings and affect the life of the buildings. Therefore, it is necessary to make improvements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction process and device for connecting channel structure of high-rise building
  • Construction process and device for connecting channel structure of high-rise building
  • Construction process and device for connecting channel structure of high-rise building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0081] Such as Figure 1 to Figure 4 As shown, the embodiment of the present application provides a high-rise building connecting channel construction process, which is characterized in that it includes the following steps:

[0082] S1. On the side facing each other of the first high-rise building 16 and the second high-rise building 17, respectively construct a fixing frame 18, and the fixing frame 18 is provided with an installation hole 19;

[0083] S2, remanufacturing the connecting piece, the structure of the connecting piece is: the main rod 20 in the middle, the first steel bar 21 and the second steel bar 22 are respectively reserved at the two ends of the main rod 20, and in the middle of the main rod 20 A first limit block 23 is provided;

[0084] S3. Insert the main rod 20 at one end where the second reinforcing bar 22 is located into the installation hole 19, and then cast a second limiting block 24 at the second reinforcing bar 22, between the second limiting bloc...

Embodiment 2

[0090] The embodiment of the present application provides a high-rise building connecting channel construction device, characterized in that the concrete grouting device includes:

[0091] A hopper 1, the top of which is open;

[0092] Lifting hopper 2, the top of which is open;

[0093] A connecting pipe 3, the two ends of which are respectively connected with the bottom end of the feeding hopper 1 and the bottom end of the lifting hopper 2;

[0094] A plurality of casing pipes 4, each casing pipe 4 is connected end to end and the bottommost casing pipe 4 communicates with the top of the lifting hopper 2;

[0095] Discharge pipe 5, which communicates with the top of the top casing 4;

[0096] Several connecting mechanisms 6, which are used to connect between adjacent sleeve pipes 4 and between the sleeve pipes 4 and the top of the lifting hopper 2;

[0097] Some lifting mechanisms 7, which are used to discharge the concrete in the lifting hopper 2 from the discharge pipe 5...

Embodiment 3

[0103] In this embodiment, in addition to the structural features of the preceding embodiments, the connection mechanism 6 includes:

[0104] The upper connection plate 601 is disc-shaped;

[0105] The lower connection plate 602 is disc-shaped;

[0106] Card edge 603, which is arranged on the edge of the bottom surface of the upper connection plate 601;

[0107] ring plate 604, which is ring-shaped;

[0108] Several quick release mechanisms 9, which are fixedly installed on the side wall of the ring plate 604 and distributed evenly along the circumferential direction;

[0109] Wherein, the upper connecting plate 601 is located above the lower connecting plate 602, the ring plate 604 is located above the upper connecting plate 601, and the installation cavity 10 is located between the upper connecting plate 601 and the lower connecting plate 602 and inside the clamp edge 603 , the quick release mechanism 9 is used to detachably connect the upper connection plate 601 and the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction process and device for a connecting channel structure of a high-rise building. According to the construction process and device for the connecting channel structure of the high-rise building, fixing frames are constructed on the sides, facing each other, of a first high-rise building and a second high-rise building correspondingly, mounting holes are formed in the fixing frames, connecting pieces are manufactured, each connecting piece comprises a main rod, a first reinforcing steel bar, a second reinforcing steel bar and a first limiting block, the main rod at one end of the second reinforcing steel bar is inserted into the mounting hole, a second limiting block is poured at the second reinforcing steel bar, a second rubber block is mounted in a gap between the second limiting block and the fixing frame, the second limiting block is tightly jacked towards one side of the fixing frame by using external force, a first rubber block is mounted in a gap between the first limiting block and the fixing frame, the external force is removed, the same structure is constructed on the fixing frame of the second high-rise building, concrete is poured on the opposite first steel bars on the main rods between the first high-rise building and the second high-rise building through a concrete grouting device, and then the main rods on the two sides are connected and fixed.

Description

technical field [0001] The invention relates to a high-rise building connection channel structure construction technology, in particular to a high-rise building connection channel structure construction process and a device thereof. Background technique [0002] In the field of construction engineering, there is usually a connecting passage built between two adjacent buildings that have been completed. The connecting passage can be used as a corridor, a sightseeing platform, etc. However, the problem is that there will be a certain amount of shaking between high-rise buildings. When affected by slight ground vibrations and high-altitude winds, the higher the floor, the more obvious the shaking will be, which will lead to subsequent increased connection channels. Due to the unbalanced shaking of the two buildings, the connection strength is affected. After long-term use, it is easy to cause damage to the connection points of the buildings and affect the life of the buildings....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/00E04B1/21E04G21/02
CPCE04B1/00E04B1/0046E04B1/21E04G21/02E04G21/025Y02E10/20
Inventor 易刚王春飞钱振军胡顺利徐文超
Owner JUJIANG CONSTR GRP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More