Hydropower station group power generation optimization method based on reservoir regulation coefficient sorting

A technology of hydropower station group and adjustment coefficient, applied in the field of electric power system, can solve the problems of complex constraint boundary, difficult to discretize and segment the search space, and difficult to solve the optimization model of hydropower station group, so as to achieve the effect of solving the complex constraint boundary.

Active Publication Date: 2021-11-26
YUNNAN POWER GRID
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It solves the problem that the constraint boundary of the joint optimization scheduling problem of the existing hydropower station group is complex, the discretization and segmentation of the search space is very difficult, and the solution of the optimization model of the hydropower station group is difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower station group power generation optimization method based on reservoir regulation coefficient sorting
  • Hydropower station group power generation optimization method based on reservoir regulation coefficient sorting
  • Hydropower station group power generation optimization method based on reservoir regulation coefficient sorting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] see figure 1 , the application provides a hydropower station group power generation optimization method based on the ordering of reservoir adjustment coefficients, including the following steps:

[0040] Collect the basic hydrological data of each hydropower station in the hydropower station group to be optimized, and the basic hydrological data include the capacity of the profit storage, the dead storage capacity, the maximum working head and the minimum working head;

[0041] Calculate the reservoir adjustment coefficients of each hydropower station in the hydropower station group according to the basic hydrological data, and number each hydropower station in the hydropower station group G (G=1.2.3...n) according to the order of the reservoir adjustment coefficients from small to large;

[0042] Initialize the original output data of each hydropower station in the hydropower station group, and generate a corresponding optimization flag variable g (g=1.2.3...n) accordi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a hydropower station group power generation optimization method based on reservoir regulation coefficient sorting. The hydropower station group power generation optimization method comprises the following steps: collecting basic hydrological data of each hydropower station in a to-be-optimized hydropower station group; calculating a reservoir adjustment coefficient of each hydropower station of the hydropower station group according to the basic hydrological data; numbering each hydropower station in the hydropower station group; initializing original output data of each hydropower station in the hydropower station group; generating a corresponding optimization mark variable according to the serial number G of each hydropower station; performing optimization processing on the generated output of each hydropower station in sequence through the objective function to obtain a generated output optimization result; correcting the original output data of the current hydropower station to obtain optimized output data; and outputting the optimized output data of each hydropower station. And the regulation capability of the hydropower station is quantitatively analyzed more finely. The problems that an existing hydropower station group joint optimization scheduling problem is complex in constraint boundary, discretization segmentation of a search space is very difficult, and the solving difficulty of a hydropower station group optimization model is large are solved.

Description

technical field [0001] The present application relates to the technical field of power systems, in particular to a method for optimizing power generation of hydropower station groups based on the ranking of reservoir regulation coefficients. Background technique [0002] In large-scale hydropower systems, due to the differences in river basins and dispatching units, hydropower station clusters are usually managed in different regions or at different levels, but there are often large differences in the adjustment capabilities of the various hydropower station subregions. Roughly dividing the regulation capacity of hydropower stations by "daily regulation, seasonal regulation, and annual regulation" leads to the fact that the optimization results cannot better utilize the multi-time scale regulation capabilities of hydropower station groups. For example, the dimension of decision variables increases linearly with the increase of the number of power stations, and the number of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/11G06Q10/04G06Q50/06
CPCG06F17/11G06Q10/04G06Q50/06Y02E40/70Y04S10/50
Inventor 司大军娄素华李玲芳吴耀武周俊东梁书豪孙鹏王远游广增陈义宣陈姝敏何烨高杉雪
Owner YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products