Construction environment monitoring system
A technology for environmental monitoring systems and construction areas, applied in measuring devices, unmanned aerial vehicles, transportation and packaging, etc., can solve the problems of limited detection area, inflexible use, and inability to support vertical pole height shortening and adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 , Figure 4 and Figure 5 As shown, a construction environment monitoring system proposed by the present invention includes an area division module, a remote monitoring UAV 100, a central control platform and an alarm module. The area division module is used to divide the construction area 12 into a plurality of adjacent monitoring zones 121 . The remote monitoring drone 100 is used to detect dust content at the center of the monitoring zone 121 . The central control platform communicates with the area division module and the remote monitoring UAV 100 respectively, and is used to receive the detection data of the dust content of the remote monitoring UAV 100, and determine whether the corresponding monitoring area 121 belongs to according to whether the detection data exceeds the dust content threshold. Judging the safety situation, when the dust content at the center of the monitoring zone 121 exceeds the threshold, the monitoring zone 121 is define...
Embodiment 2
[0048] A construction environment monitoring system proposed by the present invention, compared with Embodiment 1, in this embodiment, as Figure 4 As shown, the shaded area is a dangerous area. When the monitoring zone 121 is rectangular, the edges of adjacent monitoring zones 121 are seamlessly connected. This kind of division is relatively regular, and multiple monitoring zones 121 can form the construction area 12 without gaps.
Embodiment 3
[0050] A construction environment monitoring system proposed by the present invention, the difference between this embodiment and the second embodiment is that, as Figure 5 As shown, the shaded area is a dangerous area. When the monitoring subregion 121 is a circle, two adjacent monitoring subregions 121 are tangent, and the centers of a plurality of monitoring subregions 121 are distributed in a matrix; The estimated partition a122, the estimated partition b123, and the estimated partition c124, wherein the estimated partition a122 is the area between four adjacent monitoring partitions 121, and the estimated partition b123 is the area between one edge of the construction area 12 and two nearby monitoring partitions 121. area, the presumed partition c124 is the area between the corner of the construction area 12 and the monitoring partition 121 at the corner; when at least two of the four monitoring partitions 121 adjacent to the presumed partition a122 are designated as dang...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com