An installation method and reactor technology, which are applied to the primary side of steam generators, nuclear power generation, climate sustainability, etc., can solve the problems of limited installation and construction conditions, high installation accuracy requirements, and numerous equipment interfaces, so as to improve installation accuracy and Installation efficiency, overcoming the effect of difficult independent installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] In order to make the purpose, technical solution and technical effect of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific implementations described in this specification are only for explaining the present invention, not for limiting the present invention.
[0027] Please follow figure 1 As shown, the present invention provides a method for installing primary equipment of a reactor primary circuit, which includes the following steps:
[0028] S1) The reactor pressure vessel, reactor internals 100, inner casing 102, steam generator 20, and main pump casing are preassembled into a container module, and the reactor pressure vessel top cover, control rod driving mechanism 110, and stack roof structure 108 are prefabricated. Assembled into stack top modules;
[0029] S2) install the main equipment support 50 and the...