On-site deviation rectifying method for steel column base joint
A column foot and steel column technology, which is applied in the field of on-site deviation correction of steel column foot joints, can solve the problems that affect the construction period requirements, difficult to ensure quality, complex structure, etc., and achieve the effects of avoiding re-construction, convenient construction, and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as Figure 1-5 As shown, the on-site deviation correction method for the steel column foot joint described in this embodiment includes concrete short column 1, column foot anchor bolt 2, column foot anchor bolt head 3, conversion steel plate 4, pre-embedded steel plate 5 and secondary grouting layer 6 , the method is applied to the case where the position of the anchor bolt 2 at the foot of the column does not match the position of the original set node after the pouring of the short concrete column 1 is completed, and the method for correcting the deviation on site of the node includes the following steps:
[0029] Step 1: The pre-embedded steel plate 5 is leveled and elevated according to the installation requirements, and the anchor head 3 of the column foot anchor 2 of the wrong node is removed according to this elevation, and then the embedded steel plate 5 is socketed on the column according to the installation requirements. Foot anchor 2, and the two are wel...