Split tubing head and electric pump tubing wellhead passing construction method
A technology of oil pipe head and oil pipe, which is applied in the direction of drilling pipe, casing, drilling equipment, etc., can solve the problems of poor operation timeliness and influence on oil production efficiency, and achieve the effect of improving the maintenance efficiency of electric pumps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0027] Such as figure 1 and figure 2 As shown, a split oil pipe head includes an upper oil pipe head 9 and a lower oil pipe head 2;
[0028] The first main hole 9-1 and the first secondary hole 9-2 which are parallel and disconnected are formed in the upper oil pipe head 9, and the upper part of the first main hole 9-1 is formed in the oil pipe for connecting with the oil pipe 1. Thread, the lower part of the first main channel 9-1 forms a cylindrical groove 9-3 for connecting with the lower oil pipe head;
[0029] The second main channel 2-1 and the second auxiliary channel 2-2, which are parallel and connected, are formed in the lower oil pipe head 2, and the two form a Y-shaped channel structure. The groove 9-3 is matched with the protruding cylindrical structure 2-3, and the upper part of the second main hole 2-1 is formed with an oil pipe internal thread for connecting with the oil pipe 1.
[0030] In this embodiment, a cable suspension 8 is arranged in the second sec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


