Process route for transforming standby coal power unit and formed new system
A process route and new system technology, applied in the process route and the new system field formed, can solve the problems of waste, reduction of jobs in the coal power industry, and long-term idleness of coal power capital, so as to achieve the reduction of jobs and avoid performance degradation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be further described below in conjunction with accompanying drawing and specific embodiment:
[0032] figure 1 It is a schematic diagram of the structure of the coal-fired power unit before transformation. The coal-fired power unit is composed of a coal-fired boiler system (1), a steam power generation system (2) and a power transmission and transformation system (3); the coal-fired boiler system (1) passes through the main steam pipe The main steam pipeline (6) and the return pipeline (7) are connected in parallel; the steam power generation system (1) is connected to the steam power generation system (1) through the cable (5) Power transmission and transformation system (3) connection.
[0033] figure 2 It is a structural schematic diagram of a process route for transforming a standby coal-fired power unit and a new system formed in the present invention. A process route for transforming a standby coal-fired power unit and a new system fo...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Melting point | aaaaa | aaaaa |
| Decomposition temperature | aaaaa | aaaaa |
| Heat storage density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

