Plate intelligent production line dynamic scheduling method based on gene coding
A technology of genetic coding and dynamic scheduling, applied in the direction of genetic model, genetic law, artificial life, etc., can solve the problems of low efficiency of flexible manufacturing production management, less production line information collection, low level of intelligent production in the workshop, etc., to improve the production line The effect of scheduling capabilities and overall productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0025] Please refer to the attached figure 1 , the present invention provides a method for dynamic scheduling of panel intelligent production line based on gene coding, comprising the following steps:
[0026] S1, extracting board information, establishing a board information database, using the board information in the board information database, exporting the QR code information of each board that needs to be produced and processed on that day;
[0027] S2,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


