Construction method of double-pipe jet grouting pile
A construction method and technology of spraying piles, applied in the field of construction of double-pipe spraying piles, can solve the problems of unguaranteed pile diameter and strength, affecting construction efficiency, poor pile quality, etc., to optimize spraying parameters and improve cost. Pile quality and the effect of improving compactness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] In order to make the object, technical scheme and advantages of the embodiments of the present invention more clear, the following embodiments of the present invention in conjunction with specific specific examples, before further describing the specific embodiments of the present invention, it should be understood that the scope of protection of the present invention is not limited to the following specific embodiments; it should also be understood that the terms used in the embodiments of the present invention are used to describe a particular specific embodiment, not to limit the scope of protection of the present invention.
[0031] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those of ordinary skill in the art to which the present invention belongs will normally understand.
[0032]The present invention is not limited to the source of the raw materials employed, unless otherwise specified, the raw materials employed ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


