Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method
An enclosure structure and cast-in-place technology, which is applied in basic structure engineering, excavation, construction, etc., can solve problems such as difficult to achieve equal-strength connections, complex load environment, and difficult to apply, so as to avoid joints from being weak and have obvious social benefits , The effect of facilitating on-site construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] A prefabricated, cast-in-place combined anchorage foundation enclosure structure is mainly composed of a prestressed high-strength concrete sheet pile 1 and a cast-in-place underground diaphragm wall 2 .
[0038] The prestressed high-strength concrete sheet pile 1 is prefabricated by steam curing, the concrete strength of the pile body is C125, and the pile body is divided into two parts: a sheet pile convex section 7 and a sheet pile concave section 8.
[0039] The cast-in-situ underground continuous wall 2, the reinforcing bar cage 4 of the convex section and the reinforcing bar cage 6 of the concave section are hoisted and put into the guide groove, and then the concrete 3 is poured, and the concrete strength is C40. I-beams 5 are welded on both ends of the convex section reinforcement cage 4, which are used to strengthen the connection strength of the convex section reinforcement cage 4 and the concave section reinforcement cage 6 after the concrete 3 is poured.
[...
Embodiment 2
[0044] The patent of the present invention also relates to a construction method of a prefabricated, cast-in-place combined anchorage foundation enclosure structure, which includes the following steps:
[0045] Step 1: Carry out the preparatory work before construction, level and harden the site, measure and set out the line.
[0046] Step 2: Carry out the construction of the guide wall of the underground diaphragm wall. The guide wall shall be excavated according to the design axis of the underground diaphragm wall. After excavation, the base shall be laid with a C10 concrete cushion with a thickness of 30mm to 50mm. The formwork can be dismantled after reaching 75% of the design strength. When dismantling the formwork, ensure that the concrete surface and edges and corners are not damaged. After the formwork is dismantled, support should be added inside the guide wall in time.
[0047] Step 3: Carry out the mud preparation work, select the appropriate mud according to the stra...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com