Intelligent progress management and control method and system for information engineering supervision
A technology of information engineering and progress, applied in the directions of office automation, data processing applications, instruments, etc., can solve the problems of low precision of progress control and poor progress control effect, so as to improve the efficiency of progress control, improve the effect and quality, Effects that improve precision and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Please see attached figure 1 The present application provides an intelligent progress control method for information engineering supervision, wherein the method is applied to an intelligent progress control system for information engineering supervision, and the method specifically includes the following steps:
[0018] Step S100: Load basic project information, wherein the basic project information includes progress record data and construction status information;
[0019] Specifically, the basic information of the project is automatically loaded by the information loading module of the intelligent progress control system for information engineering supervision. Wherein, the project is any project that uses the intelligent progress management and control system for information engineering supervision of the present application for progress management and control. For example, the project may be a railway station renovation project, a subway construction project, a sce...
Embodiment 2
[0063] Based on the same inventive concept as the intelligent progress control method for information engineering supervision in the foregoing embodiment, the present invention also provides an intelligent progress control system for information engineering supervision. Please refer to the appendix Figure 4 , the system includes:
[0064] an information loading module 11, the information loading module 11 is used to load basic project information, wherein the basic project information includes progress record data and construction status information;
[0065] A dismantling module 12, the dismantling module 12 is used for dismantling the construction process of the project according to the planned progress information, and generating multiple sets of construction chain lists;
[0066] a matching module 13, which is used to input the basic information of the project into the multiple groups of construction chain lists, and match the construction chain nodes and the planned prog...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com