Construction method for breaking and removing virtual pile head without girdling
A construction method and pile head technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of complicated construction, noise disturbance and other problems, and achieve the effects of simple process, convenient cleaning and chiseling, and high work intensity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present application will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the related invention, but not to limit the invention. In addition, it should be noted that, for the convenience of description, only the parts related to the invention are shown in the drawings.
[0020] It should be noted that the embodiments in the present application and the features of the embodiments may be combined with each other in the case of no conflict. The present application will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
[0021] refer to figure 1 As shown, the present invention provides a construction method for removing virtual pile heads without ring cutting, comprising the following steps:
[0022] S1: Cast the pile foundation concrete 1 to the foundation elev...