Method for acquiring opening timing of natural fracture under in-slit temporary plugging condition
a technology of inslit temporary plugging and natural fracture, which is applied in the direction of sealing/packing, fluid removal, borehole/well accessories, etc., can solve the problems of hydraulic fracture continuing to extend forward, losing the plugging effect of temporary plugging section, and continuously increasing extrusion, so as to achieve accurate calculation of opening timing, high calculation accuracy, and reliable principle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0078]The following invention provides many different embodiments, or examples, for implementing different features of the provided subject matter. Specific examples of components and arrangements are described below to simplify the present invention. These are, of course, merely examples and are not intended to be limiting. For example, the stratum of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed between the first and second features, such that the first and second features may not be in direct contact. In addition, the present invention may repeat reference numerals and / or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and / or configurations discussed.
[0079]Furthe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

