Method for mounting bridge main tower cross beam top steel box girder segment
An installation method and technology of steel box girders, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as difficult installation of steel box girder segments and obstacles in the space position of the main tower, so as to achieve accurate lifting and lowering input effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The arrangement of the installation equipment of the present invention is shown in Figures 1 to 3, mainly including the bracket 3 next to the pier attached to the lower beam 17, the distribution beam 2, the longitudinal slide 7, the front leg 5, and the rear leg 9 And support truss 4 and walking crane 1 etc. There are also jack 6, through-type jack 11, jack reaction force frame 12, temporary connection 13, guide chain 14, tower column 16 etc. among the figure.
[0020] Other auxiliary facilities and equipment include:
[0021] (1) When the steel box girder is transported ashore by water, supporting wharf facilities and shore transportation equipment are required.
[0022] (2) Water transportation, anchoring and positioning facilities and equipment should be provided for water erection.
[0023] (3) Temporary erection structures and installations such as walking cranes need to be equipped with horizontal transportation and vertical hoisting (tower cranes, etc.) equipme...