Prying supercharging integration method
An integrated method and skid-mounted technology, which is applied in the direction of earthwork drilling, mining fluid, wellbore/well components, etc., can solve the problems of inconvenient operation and maintenance, long production cycle, large floor area, etc., and shorten the production and installation cycle , Enhanced heat transfer strength, satisfying the effects of deformation coordination
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] implemented as figure 1 As shown, the pressurized tank body is made up of left and right chambers and a pressurization device 10 . The right cavity is a heating area, which is equipped with a heating device consisting of a burner 1, a torch and a smoke pipe 4, and an elastic heating pipe box 3, and the two ends of the elastic heating pipe box 3 are respectively connected with a crude oil mixture inlet connection pipe 2 and an outlet short joint 5 The left cavity is a buffer zone, and the top of the pressurized tank body of the buffer zone is equipped with a fog-catching and separating device 7, and the vertical fog-catching and separating device 7 is provided with a gas outlet 8, and the booster device 10 is connected to the buffer zone through a water-containing crude oil outlet connecting pipe 9 connected to the external output port 11 at the same time; the left and right chambers of the pressurized tank are separated by the middle partition 6 and communicate with the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 