Integral bridge descending construction method and construction equipment
A construction method and overall technology, applied in bridge construction, bridge, bridge maintenance, etc., can solve the problems of complex process and high cost, and achieve the effect of low construction cost and reduced construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] Examples see figure 1 , figure 2As shown, in order to ensure the integrity of the bridge during the descent process, steel structures 8 are used at both ends of the abutment and pier cover beam 4 to temporarily connect the bridge deck structure and the cover beam. The temporary connection between the bridge deck structure and the bridge pier adopts a steel structure, and M36 bolts are drilled and buried on the bridge deck and the reinforced concrete structure of the cover beam for connection. The main body of the temporary connecting steel structure is composed of 14mm thick steel plate and additional ribs, and the gap between the steel structure steel plate and the concrete structure is filled with grouting.
[0056] see Figure 3-6 As shown, in order to prevent accidental horizontal displacement or even collapse during the bridge’s descent, reinforced concrete guide tenons 9 and guide grooves 10 are respectively set on the abutment cover beam 1 and cap platform. Th...
PUM