Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
A technology of manual hole-digging piles and construction methods, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., and can solve problems such as short construction time, long production time, and complex construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] Attached below Figure 1-2 The embodiment of the present invention is described in further detail:
[0045] A project example: Since part of the pile foundation is located in a karst cave, and the burial depth of the karst cave is about 35m, the pile length is designed to be 30-40m, and some piles will exceed 40m; in addition, due to the geological conditions of the site, some piles without karst caves are artificially dug. The length exceeds 35m. The construction of this part of manual excavation pile is difficult and dangerous. In order to ensure the construction safety and reliability of this part of artificially dug piles (karst caves and super-long piles), the super-long artificially dug piles of the present invention are specially adopted to pass through the karst cave construction method.
[0046] The construction steps are as follows:
[0047] Step 1: Leveling the site, laying out the wires, and fixing the pile positions;
[0048] Step 2: Excavate layer by l...