Method for realizing emergency control on frequency and voltage of electric system

An emergency control and power system technology, applied in the direction of power network operating system integration, information technology support system, AC network voltage adjustment, etc., can solve the problems of frequency and voltage emergency control devices refusing to operate, inability to distinguish power grids, and large absolute values. Achieved the effect of solving the problem of refusal of the frequency and voltage emergency control device

Active Publication Date: 2013-04-10
NARI TECH CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The analysis shows that when a serious fault occurs in the power system and the active power or reactive power is seriously unbalanced, the absolute value of df / dt or dV / dt may be very large, which will cause the frequency and voltage emergency control device designed according to the traditional method to refuse to operate
In other words, the absolute value of df / dt or dV / dt alone cannot distinguish whether an emergency situation has occurred in the power grid and emergency control should be implemented, or an abnormal situation such as the actual effect of the measurement circuit has occurred and the control should be blocked
[0007] Therefore, the traditional frequency voltage emergency control design method has the danger of causing serious consequences due to refusal to take control measures when the emergency state of the power grid urgently needs to be taken.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for realizing emergency control on frequency and voltage of electric system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The geographic wiring of the power grid in region A is as follows: figure 1 shown. The power grid in this area is connected with the provincial grid through the 500kV double-circuit line from BUS_3 to BUS_4.

[0029] When the BUS_3-BUS_4 double-circuit line of the regional and provincial network was disconnected for some reason, the isolated network in this area operated and there was a large power shortage. If part of the load cannot be shed quickly, the voltage will collapse rapidly.

[0030] During the start-up phase of the low-voltage load-shedding device (the voltage setting is usually 0.9p.u.), the change of the bus voltage per 100ms exceeds 0.1 p.u., which will cause the traditional low-voltage load-shedding device to refuse to operate due to blocking, and the voltage will be lower than 0.7 for a long time. per unit value, the device cannot be unlocked, eventually causing the grid voltage to collapse.

[0031] When the region is in a state of voltage emergency...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for realizing the emergency control on the frequency and the voltage of an electric system. On the basis of a bus voltage V, a frequency f, a generator or a load current I of an installing place of a frequency and voltage emergency controller, the emergency state, the measuring loop abnormal state and the load feedback state of the frequency and the voltage of the electric system can be automatically recognized, and the execution of the emergency control action can be correspondingly unlocked or locked. The method introduces the current amount measurement in a traditional controller, and a key problem that the device measuring abnormity and the electric network emergency state can not be correctly distinguished only through the variation rate of the frequency or the voltage can be solved.

Description

technical field [0001] The invention relates to an automatic control method of a power system, in particular to a method for realizing emergency control of the frequency and voltage of the power system. Background technique [0002] The frequency and voltage emergency control of the power system is an important technical means to prevent the stability of the power grid from being damaged and large-scale power outages. [0003] In order to ensure that after a sudden active power shortage occurs, the reserved operating load capacity can be adapted to the operating generating capacity at any time, and the system frequency can be quickly restored to the rated value, and an automatic load shedding device for frequency reduction must be configured. Similarly, the experiment of installing the automatic load shedding device according to the voltage reduction lacks the necessary safety automatic device in the reactive area. [0004] In addition, in order to reduce the mutual influen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/14
CPCY04S20/224Y02B70/3225Y04S20/222
Inventor 方勇杰杨卫东邵俊松刘福锁徐泰山李碧君鲍颜红许剑冰张长银薛禹胜
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products