Freeze thawing consolidation method for silt soft foundation
A technology of silt and soft foundation, applied in the field of freeze-thaw consolidation of silt soft foundation, can solve the problems of long vacuuming time, affecting the progress of the project, low strength, etc., achieve fast drainage speed, fast construction speed, and improve work efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0021] The key of this process is the freezing of sludge. Since the water content of sludge (especially dredging sludge) is very high, the heat release of water freezing is very large, and the energy consumption is also large. Therefore, construction must be carried out in severe cold weather in winter. The use of natural cold wind for sludge freezing can greatly save energy. Adopting a reasonable assembly line procedure is also the key to saving energy.
[0022] A kind of freeze-thaw consolidation method of silt soft foundation, comprises the steps:
[0023] Drying and sedimentation of dredged fill: Since the newly dredged silt has a high water content of 150-300% and is gruel-like, it needs to be dried to ensure construction safety. The drying and sedimentation time is generally 4 to 6 months, and the next step can be carried out when the water content of the surface silt is less than 100%.
[0024] Laying brambles: In order to work on the cushion construction, brambles mu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com