A technology of air-conditioning system and control method, which is applied in the direction of heating and ventilation control system, heating and ventilation safety system, heating method, etc., which can solve problems such as complex situations, and achieve the effects of improving capacity, increasing electric energy, and effectively utilizing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] see Figure 1-Figure 2 In addition to the solar power generation unit 101, the DC-DC conversion unit 102, the main control unit 103, the power storage unit 104, the inverter air-conditioning unit 106 and the DC-AC inverter unit 107, the solar air-conditioning system 10 in the present invention also includes Inverting the output unit 105 and the mains grid 108 . The inverter output unit 105 includes a DC-AC inverter unit 107 and a commercial power grid 108 . Wherein, the power storage unit 104 , the inverter air conditioner unit 106 and the DC-AC inverter unit 107 are power load units receiving current.
[0040] The solar power generation unit 101 generates electric energy, which is boosted by the DC-DC conversion unit 102 to become high-voltage direct current, and then sent to the inverter air conditioner unit 106 through the main control unit 103, and the high-voltage direct current can also be sent to the inverter output unit through the main control unit 103 105 , ...
Embodiment
[0053] see figure 1 and image 3 The difference between this embodiment and Embodiment 1 is that: when step a detects that the solar power generation unit 101 generates current, the current is supplied to the inverter air conditioner unit 106 first, then to the power storage unit 104, and to the DC- The AC inverter unit 107 supplies current.
[0054] That is, after step a, run step c110 to detect whether the variable frequency air conditioner unit is started, if it is found that the variable frequency air conditioner unit is started, then run step c111 to supply current to the variable frequency air conditioner unit, if it is found that the variable frequency air conditioner unit is not started, then run step c120.
[0055] Step c120, check whether the electric storage unit is fully charged, if it is found that the electric storage unit is not fully charged, execute step c121, supply current to the electric storage unit; if find that the electric storage unit is fully charged...
Embodiment 3
[0060] In the third embodiment of the present invention, in addition to the above-mentioned order of supplying current to the inverter air conditioner unit first, then to the power storage unit, and last to the DC-AC inverter unit, the user can The defined method determines the priority order of user tendency to meet the special requirements of different situations in different regions of users. For example, it can be used: the highest priority is to supply current to the storage unit, the second is to supply current to the inverter air conditioning unit, and the last is to supply current to the DC-AC inverter Change the order in which the units supply current. Among them, the power storage unit can not only supply the frequency conversion air conditioner unit, but also other electrical devices can get power from it, so there will be such a priority order.
[0061] Refer to the second embodiment for the rest of the undescribed parts, and will not repeat them here.