Pull-out technology of temporary steel casing of steel pipe column
A technology of steel casing and steel pipe column, applied in water conservancy projects, artificial islands, excavation, etc., can solve problems such as increasing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The technological process of steel casing lifting:
[0018] 1. Process flow
[0019] Pad stones within 2m around the hole → put two 2cm thick steel plates under the platform of the lifting device → install the lifting equipment → install and debug the power system and operating system → place four 200t jacks symmetrically and operate simultaneously → 300t crane is in place → Disassemble the lifting equipment → Pull out the steel casing → Lower the steel casing
[0020] 2. Process operation requirements
[0021] (1) Guarantee the verticality of the hole;
[0022] (2) Carry out steel pipe column pouring in strict accordance with the plan;
[0023] (3) After the steel pipe column locator is installed, untie the inner flange of the steel casing;
[0024] (4) The jacking process should be slow and steady;
[0025] (5) The 300t crane should hoist the steel casing of the upper section in time;
[0026] (6) The welding quality of the inner ribs of the steel casing should ...