A technology of tower container and docking interface, which is applied in the field of hoisting and docking of tower container, can solve the problems of difficult operation by workers, large slenderness ratio of the container, and difficult docking, and achieves good positioning effect, simple operation steps, and shortened time. The effect of the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Such as figure 1 , figure 2 , image 3 , Figure 4 with Figure 5 The hoisting and docking method of a tower type container shown is characterized in that it comprises the following steps:
[0035] Step 1. Preparations before hoisting the upper tower body: install the lower tower body 2 vertically on the tower body foundation, and install multiple positioning fixtures 6 on the outer wall of the lower tower body 2 and near the upper end docking port 2-1, A plurality of positioning plates 7 are installed on the outer wall of the upper tower body 1 to be docked with the lower tower body 2 and near the lower end docking port 1-1. The positioning plates 7 correspond to the positioning fixtures 6 one-to-one and can be inserted into the positioning cards. Tool 6; before step 1, it is necessary to complete the treatment of the foundation of the tower body, install the anchor bolts, shovel the pockmarked surface, and arrange the pad iron, and then start the operation of ste...