Deep coal mine roadway grout body maintenance method
A deep mine roadway and grouting technology is applied in the field of grouting body maintenance for deep mine roadways, which can solve the problems of neglecting rock mass strength, delaying production, rework, etc., and achieves the effects of alleviating mining contradictions, saving maintenance costs, and improving strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Example one as figure 1 , figure 2 As shown, the coal mine deep shaft roadway grouting body maintenance method steps of the present embodiment:
[0023] (1) Initial spraying is carried out on the surrounding rock loosening ring 6 surface of the tunneling section of the coal mine deep shaft roadway, forming a shotcrete layer of the initial spraying up to 7 cm; then arranging anchor rods and laying a layer of steel wire mesh on the shotcrete layer of the initial spraying; Carry out re-spraying on steel wire net then, the sprayed grout layer that forms re-spraying reaches 14 centimetres. The shotcrete layer 1 of the surrounding rock loosening ring 6 is composed of the initial shotcrete layer, the steel wire mesh and the resprayed shotcrete layer. The main components of the grout for initial spraying and respraying are mixtures of cement, water, sand and stones, and the weight ratio of cement, water, sand and stones in the mixture of cement, water, sand and stones is 0.8...
Embodiment 2
[0033]The shotcrete layer of embodiment 2 just sprayed reaches 7.5 centimeters; The sprayed grout layer that forms double spray reaches 14.5 centimeters, and the weight ratio of cement, water, sand, stone in the mixture of cement, water, sand, stone is 1: 1: 2 : 2; the vertical spacing and the transverse spacing between the maintenance hole 5 on the surrounding rock loosening ring 6 and the maintenance hole 5 are 2.3 meters; the vertical spacing between the grouting hole 4 and the grouting hole 4 on the surrounding rock loosening ring 6 and The horizontal spacing is 1.5 meters; the grout for the grouting of the surrounding rock loose ring 6 is a mixture of cement and water, and the weight ratio of cement and water is 1:1.9; the curing period is 23 days; other construction methods are the same as those in the examples.
Embodiment 3
[0034] Embodiment 3 The shotcrete layer of just spraying reaches 8 centimeters; The shotcrete layer that forms respray reaches 15 centimeters, and the weight ratio of cement, water, sand, stone in the mixture of cement, water, sand, stone is 1.2: 1.2: 2.2 : 2.2; the longitudinal spacing and the transverse spacing between the maintenance hole 5 on the surrounding rock loosening ring 6 and the maintenance hole 5 are 2.6 meters; the vertical spacing between the grouting hole 4 and the grouting hole 4 on the surrounding rock loosening ring 6 and The horizontal spacing is 1.8 meters; the grout for the grouting of the surrounding rock loose ring 6 is a mixture of cement and water, and the weight ratio of cement and water is 1.2:2; the curing period is 26 days; other construction methods are the same as in the embodiment.