Method for detecting alkali burnout resistance of priming coat
An anti-pan-alkali, primer technology, used in measuring devices, instruments, scientific instruments, etc., can solve problems such as affecting the progress of experiments and reducing the efficiency of new product development, saving development time, reducing development costs, and easy to achieve. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Scrape the putty on a cement board of 1000mm×1000mm, the scraping time of the putty is 1 hour, and dry for 3 hours at a temperature of 35°C and a relative humidity of 70%; then brush 1 on the basis of the above putty #Primer paint sample, the brushing time of described primer is 0.5 hour, and the brushing thickness of primer is the brushing thickness during actual construction, is that temperature dries 2 hours under the condition of 35 ℃ and relative humidity 70%; Then A blue topcoat with 50% PVC was applied by brushing, the brushing time of the topcoat was 0.5 hour, and the temperature was 35° C. and the relative humidity was 70% and dried for 1 hour. Observed with the naked eye after 0.5 hours, on the paint film surface of the blue topcoat, white alkaline substances ooze out. Among them, the putty, topcoat and 1# primer samples used are all supporting products, and the total time required to complete the test is about 8.5 hours.
Embodiment 2
[0021] Scrape the putty on a 1000mm×1000mm cement board, the scraping time of the putty is 1 hour, and dry for 3 hours at a temperature of 35°C and a relative humidity of 70%; then brush on the above putty for 2 #Primer paint sample, the brushing time of described primer is 0.5 hour, and the thickness of brushing is consistent with the thickness of primer brushing in embodiment 1, is then dried 2 hours under the condition of 35 ℃ and relative humidity 70% at temperature Then brush the blue topcoat that PVC is 50%, and the brushing time of described topcoat is 0.5 hour, is dried 1 hour under the condition that temperature is 35 ℃ and relative humidity 70%. Observed with the naked eye after 0.5 hours, no white alkaline substances ooze out on the paint film surface of the blue topcoat. Among them, the putty, topcoat and 2# primer samples used are all supporting products, and the total time required to complete the test is about 8.5 hours.
Embodiment 3
[0023] Scrape the putty on a 1000mm×1000mm cement board, the scraping time of the putty is 1 hour, and it is dried for 3 hours at a temperature of 35°C and a relative humidity of 70%; then brush 3 hours on the basis of the above putty #Primer paint sample, the brushing time of described primer is 0.5 hour, and the thickness of brushing is consistent with the thickness of primer brushing in embodiment 1, is then dried 2 hours under the condition of 35 ℃ and relative humidity 70% at temperature Then brush the blue topcoat that PVC is 50%, and the brushing time of described topcoat is 0.5 hour, is dried 1 hour under the condition that temperature is 35 ℃ and relative humidity 70%. Observed with the naked eye after 0.5 hours, on the paint film surface of the blue topcoat, serious white alkaline substances ooze out. Among them, the putty, topcoat and 3# primer samples used are all supporting products, and the total time required to complete the test is about 8.5 hours.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com